Tender Details

Particulars Details
Title
Strengthening And Upgradation By Pqc And White Topping On Garoth Boliya Road Km 3,5 To 12 16/6 10,17/6 8 Total 10.00 Including Eclectic Poll Shifting Work Dn Mandsaour
Description
Strengthening And Upgradation By Pqc And White Topping On Garoth Boliya Road Km 3,5 To 12 16/6 10,17/6 8 Total 10.00 Including Eclectic Poll Shifting Work Dn Mandsaour
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_414452_1
Reference
Number
09/CE/GN/25-26 dated 03-04-2025
Tender Fee 31180
EMD 10 Lakh
Tender Value
Place EE MANDSOUR
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=489147
Start Date April 07, 2025 15:30
End Date

29/04/2025 ( Expired 19 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Read more
Bt. renewal work on riniya, sarsi, naktara length 3.00 km., heeralal tapra road length 1.00 km. and mohanpura to shamshabad road length 1.10 km. total length 5.10 km.

Bt. renewal work on riniya, sarsi, naktara length 3.00 km., heeralal tapra road length 1.00 km. and mohanpura to shamshabad road length 1.10 km. total length 5.10 km.

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more
Improvement and metalling of chandi to badhalag road in km. 6/00 to 12/300

Improvement and metalling of chandi to badhalag road in km. 6/00 to 12/300.(sh repair of damaged portion by p/l gsb, wmm, bm,bc, interlocking tiles pavements and c/o v-shape drain at various rds.)

Read more
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).

Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).

Read more
Widening and strengthening work in chainage 0.000 to 18.800 of atarra oran chausad road -length 18.800 km- utility shifting -work of removal of electric poles etc-

Widening and strengthening work in chainage 0.000 to 18.800 of atarra oran chausad road -length 18.800 km- utility shifting -work of removal of electric poles etc-

Read more
Utility shifting work for widening and strengthening of bagbada uttarakhand border road from km 38 of nh-87 to gurudwara via dibdiba chanden

Utility shifting work for widening and strengthening of bagbada uttarakhand border road from km 38 of nh-87 to gurudwara via dibdiba chanden

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise