Tender Details

About Tender

🛣️ Invitation For Project Management Consultancy Services 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Is Seeking To Engage A Professional Consultancy For The Project Management Of The Design And Supervision Of The Construction Of A Road Segment From Dhalwala Start Of Tunnel To Km 235.615 Of Nh 58, Spanning 7.0 Km And Including Five Tunnels Of Varying Lengths. 📅 Bid Submission Deadline: May 15, 2024, 5:00 Pm Tender Fee: Inr 5000 Emd: Nil This Project Involves A Critical Infrastructure Development And Requires A Consultant With Extensive Experience In Road Construction And Tunnel Design. Interested Consultants Should Submit Detailed Proposals, Including Their Qualifications, Experience, And Methodology For Project Management, By The Stipulated Deadline. Keywords: Project Management Consultancy, Road Construction, Tunnel Design, Infrastructure Development, Ministry Of Road Transport And Highways, Government Tender, Nh 58, Rishikesh Bypass
Particulars Details
Title
Project Management Consultancy Services For Design And Supervision Of Construction Of Road Starting From Dhalwala Start Of Tunnel To Km 235.615 Of Nh 58 Length 7.0 Km With Five Tunnels Of Length 750m, 100 M,100 M,200 M And 300m.
Description
Project Management Consultancy Services For Design And Supervision Of Construction Of Road Starting From Dhalwala Start Of Tunnel To Km 235.615 Of Nh 58 Length 7.0 Km With Five Tunnels Of Length 750m, 100 M,100 M,200 M And 300m.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_795222_1
Reference
Number
RO/UK/Rishikesh Bypass-II/2023-24/Dhalwala
Tender Fee 5000
EMD 0
Tender Value
Place Rishikesh Bypass
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835853

Start Date February 19, 2024 22:30
End Date
Expired 31/05/2024

Expired 734 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Read more
Consultancy services for feasibility study, preparation of dpr and pre-construction services for upgradation of zojila -kargil - leh road nh-01 from km 232.00 near pashkum to km 391.00 in the union territory of ladakh.

Consultancy services for feasibility study, preparation of dpr and pre-construction services for upgradation of zojila -kargil - leh road nh-01 from km 232.00 near pashkum to km 391.00 in the union territory of ladakh

Read more
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.

Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.&#x0d

Read more
Consultancy services of authority engineer for supervision of project of four laning of koilwar to bhojpur of nh-30 and 84 from existing chainage km. 137.375 of nh-30 to km. 27.370 of nh-84 (design chainage km. 33.250 to km. 77.100) (design length- 4

Consultancy services of authority engineer for supervision of project of four laning of koilwar to bhojpur of nh-30 and 84 from existing chainage km. 137.375 of nh-30 to km. 27.370 of nh-84 (design chainage km. 33.250 to km. 77.100) (design length- 4

Read more
Consultancy services for supervision consultants of new nh-354 section from khemkaran to start of amritsar bypass from km 22.673 to km 71.496 for length of 48.822 km on epc mode in the state of punjab

Consultancy services for supervision consultants of new nh-354 section from khemkaran to start of amritsar bypass from km 22.673 to km 71.496 for length of 48.822 km on epc mode in the state of punjab

Read more
Consultancy services for authoritys engineer for supervision of construction of major bridge on painganga river along with approaches (having length ol 1130m) from design chainage km. 52.450 to km 53.680 of nh 548cc (total length of the project 1230

Consultancy services for authoritys engineer for supervision of construction of major bridge on painganga river along with approaches (having length ol 1130m) from design chainage km. 52.450 to km 53.680 of nh 548cc (total length of the project 1230

Read more
Consultancy services for supervision consultants of o and m of four lane zirakpur-start of sangrur bypass section of nh-64 (new nh-07) from km 0.000 to km 110.720 in the state of punjab

Consultancy services for supervision consultants of o and m of four lane zirakpur-start of sangrur bypass section of nh-64 (new nh-07) from km 0.000 to km 110.720 in the state of punjab

Read more
Consultancy services for authority engineer for supervision of construction/ improvement of lachung-yumthang-zadong road (part of nh-310a) design chainage from km 52.808 to km 81.203 (pkg-vi and net length 28.395 km) from cl-9 to nhdl

Consultancy services for authority engineer for supervision of construction/ improvement of lachung-yumthang-zadong road (part of nh-310a) design chainage from km 52.808 to km 81.203 (pkg-vi and net length 28.395 km) from cl-9 to nhdl

Read more
Consultancy services as authoritys engneer for supervision of construction of uni-directional twin tunnels at shinkun la pass of length 4.1 km including civil and electrical/ mechanical work along with approaches connecting darcha- padam highway to n

Consultancy services as authoritys engneer for supervision of construction of uni-directional twin tunnels at shinkun la pass of length 4.1 km including civil and electrical/ mechanical work along with approaches connecting darcha- padam highway to n

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise