Tender Details

Particulars Details
Title
Krishna Koyna Lift Irrigation Scheme Irrigation Management And Maintainance Of Lingnoor Branch Canal Km. 1 To 15 During Rotation And Non Rotation Period For The Yea
Description
Krishna Koyna Lift Irrigation Scheme Irrigation Management And Maintainance Of Lingnoor Branch Canal Km. 1 To 15 During Rotation And Non Rotation Period For The Yea
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1116999_1
Reference
Number
B-1-5 for 2024-25
Tender Fee 2860
EMD 24000
Tender Value
Place Sangli
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1984437
Start Date January 17, 2025 23:50
End Date

24/01/2025 ( Expired 87 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa

Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa

Read more
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Read more
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh

Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh&#x0d

Read more
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117

Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117

Read more
Niet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)

Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura

Read more
Providing tap connections to consumers, extension and augmentation of water supply system at lohian khas district jalandhar for distribution network under amrut 2.0 scheme (part-1).

Providing tap connections to consumers, extension and augmentation of water supply system at lohian khas district jalandhar for distribution network under amrut 2.0 scheme (part-1).

Read more
Supply, installation, testing and commissioning for construction of 11 kv line, and creation 400kva sub- stations for lift irrigation scheme main akchmal kargil

Supply, installation, testing and commissioning for construction of 11 kv line, and creation 400kva sub- stations for lift irrigation scheme main akchmal kargil

Read more
Drilling of 200mm dia bore well solar submersible pump for lift irrigation scheme at tsasmaskor thang gongma at sumda chanmo and chun.

Drilling of 200mm dia bore well solar submersible pump for lift irrigation scheme at tsasmaskor thang gongma at sumda chanmo and chun.

Read more
Construction of lining on disnet of tail branch canal of irbc km 1 to 2 and disnet of dharmabad branch canal km 1 to 12.

Construction of lining on disnet of tail branch canal of irbc km 1 to 2 and disnet of dharmabad branch canal km 1 to 12.

Read more
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.

Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise