Tender Details
Particulars | Details |
---|---|
Title |
Krishna Koyna Lift Irrigation Scheme Irrigation Management And Maintainance Of Lingnoor Branch Canal Km. 1 To 15 During Rotation And Non Rotation Period For The Yea
|
Description |
Krishna Koyna Lift Irrigation Scheme Irrigation Management And Maintainance Of Lingnoor Branch Canal Km. 1 To 15 During Rotation And Non Rotation Period For The Yea
|
Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
Tender Id | 2024_CWRDP_1116999_1 |
Reference Number |
B-1-5 for 2024-25 |
Tender Fee | 2860 |
EMD | 24000 |
Tender Value | |
Place | Sangli |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1984437 |
Start Date | January 17, 2025 23:50 |
End Date |
24/01/2025 ( Expired 87 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreRoutine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Read moreConstruction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Read moreNiet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreProviding tap connections to consumers, extension and augmentation of water supply system at lohian khas district jalandhar for distribution network under amrut 2.0 scheme (part-1).
Providing tap connections to consumers, extension and augmentation of water supply system at lohian khas district jalandhar for distribution network under amrut 2.0 scheme (part-1).
Read moreSupply, installation, testing and commissioning for construction of 11 kv line, and creation 400kva sub- stations for lift irrigation scheme main akchmal kargil
Supply, installation, testing and commissioning for construction of 11 kv line, and creation 400kva sub- stations for lift irrigation scheme main akchmal kargil
Read moreDrilling of 200mm dia bore well solar submersible pump for lift irrigation scheme at tsasmaskor thang gongma at sumda chanmo and chun.
Drilling of 200mm dia bore well solar submersible pump for lift irrigation scheme at tsasmaskor thang gongma at sumda chanmo and chun.
Read moreConstruction of lining on disnet of tail branch canal of irbc km 1 to 2 and disnet of dharmabad branch canal km 1 to 12.
Construction of lining on disnet of tail branch canal of irbc km 1 to 2 and disnet of dharmabad branch canal km 1 to 12.
Read moreProject management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Read moreof your Industry type