Tender Details

Particulars Details
Title
Krishna Koyna Lift Irrigation Scheme Irrigation Management Of Salgare Main Canal Km. 1 To 10 During Rotation And Non Rotation Period For The Year 2024 25
Description
Krishna Koyna Lift Irrigation Scheme Irrigation Management Of Salgare Main Canal Km. 1 To 10 During Rotation And Non Rotation Period For The Year 2024 25
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1115763_1
Reference
Number
B-1/3 for 2024-25
Tender Fee 2860
EMD 14000
Tender Value
Place sangli
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1984397
Start Date January 17, 2025 23:30
End Date

24/01/2025 ( Expired 147 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Annual rate contract for supply of onion fresh for a period for one year from 11 oct 25 to 10 oct 26 at ins shivaji lonavala

Annual rate contract for supply of onion fresh for a period for one year from 11 oct 25 to 10 oct 26 at ins shivaji lonavala

Read more
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).

Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).

Read more
S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 10

S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 10

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise