🏗️ Custom Bid Invitation: Soil/Soft Rock Excavation Services 🛠️ Gail India Limited, Under The Ministry Of Petroleum And Natural Gas, Is Seeking Bids For The Provision Of Soil Or Soft Rock Excavation Services, Specifically For Excavation Up To 3 Feet Deep. 🌱 🗓️ Bid Submission Deadline: June 3, 2024, 4:00 Pm Interested Bidders Must Demonstrate Their Capability To Perform The Excavation Work To The Required Standards And Specifications. Detailed Proposals, Including Methodology, Equipment, And Pricing, Are To Be Submitted By The Deadline. Keywords: Gail India Limited, Soil/Soft Rock Excavation, Services, Ministry Of Petroleum And Natural Gas, Bid Invitation, Infrastructure Services| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Services For Providing Soil Or Soft Rock Excavation 3 Ft Deep Bidder Must
|
| Description |
|
| Organisation | GAIL India Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4938831 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 13, 2024 22:31 |
| End Date |
Expired
03/06/2024
Expired 867 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | Anarc Networking | 31-05-2024 18:01:24 | MSE | Qualified |
| 2 | S.P. TELECOM | 01-06-2024 18:01:07 | MSE | Qualified |
| 3 | SPIDERLINK TECHNO PRIVATE LIMITED | 03-06-2024 11:51:29 | MSE | Disqualified |
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Read moreWork regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.
Work regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.
Read moreHa contractors for clearing, handling and storage of cement at moosapet hyderabad t.s., with godown facility and godown size must be from 700 sq. ft. to 1000 sft
Ha contractors for clearing, handling and storage of cement at moosapet hyderabad t.s., with godown facility and godown size must be from 700 sq. ft. to 1000 sft
Read moreChair,table,book shelf,pigeon hole rack multipurpose shelf,soft board,white or green board,elephant wave slide,rider sultana rock n ride,rocker two way pony rocker,centre mat
Chair,table,book shelf,pigeon hole rack multipurpose shelf,soft board,white or green board,elephant wave slide,rider sultana rock n ride,rocker two way pony rocker,centre mat
Read moreCustom bid for services - hiring of mini bus services along with 2skilled and 2unskilled manpower as per sow scc and sor of tender document bidder must quote total amount incl service charge and applicable gst considering 24 hrs duty and 8300 kms per..,custom bid for services - hiring of scorpio vehicle along with 2skilled manpower as per sow scc and sor of tender document bidder must quote total amount incl service charge and applicable gst considering 24 hrs duty and 1800 kms per month for 36 mo..
Custom bid for services - hiring of mini bus services along with 2skilled and 2unskilled manpower as per sow scc and sor of tender document bidder must quote total amount incl service charge and applicable gst considering 24 hrs duty and 8300 kms per..,custom bid for services - hiring of scorpio vehicle along with 2skilled manpower as per sow scc and sor of tender document bidder must quote total amount incl service charge and applicable gst considering 24 hrs duty and 1800 kms per month for 36 mo..
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreBorosil glass medium size,duracell pencil battery aa,broom soft steel handle,lizol floor cleaner and toilet cleaner 500 ml,metal rat trap cage 37x20x16 cm large,white board size 4ft x 4 ft,easel stand size 5 ft three legged,magnetic fly proof door curtain 07x03 sqft,luvyansh genuine leather multipurpose desk organizer 6 in one desktop pen stand 33 x 23 cm
Borosil glass medium size,duracell pencil battery aa,broom soft steel handle,lizol floor cleaner and toilet cleaner 500 ml,metal rat trap cage 37x20x16 cm large,white board size 4ft x 4 ft,easel stand size 5 ft three legged,magnetic fly proof door curtain 07x03 sqft,luvyansh genuine leather multipurpose desk organizer 6 in one desktop pen stand 33 x 23 cm
Read moreConstruction of a ghat at nutan bandh kumhardih under hathudih panchaya (2) construction of a 50 ft ghat at mahuda basti sundi bandh under mahuda panchayat (3) installation of deep boring, tank and tap in front of the defective boring at radhanagar h
Construction of a ghat at nutan bandh kumhardih under hathudih panchaya (2) construction of a 50 ft ghat at mahuda basti sundi bandh under mahuda panchayat (3) installation of deep boring, tank and tap in front of the defective boring at radhanagar h
Read moreof your Industry type