Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Works On Air Bottles, Boiler, Stp And Ows On Orv Sindhu Sadhana
|
Description |
Works On Air Bottles, Boiler, Stp And Ows On Orv Sindhu Sadhana
|
Organisation | Hindustan Shipyard Limited | Public Sector Undertakings |
Tender Id | 2024_HSL_94041_1 |
Reference Number |
20 / 22019 / 062 / Misc Engg / 2023-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | HSL Visakhapatnam |
Link | eprocurehslgsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=103480 |
Start Date | January 08, 2024 20:30 |
End Date |
05/02/2024 ( Expired 499 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRoad safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana
Road safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana
Read moreInterception and di of nallahs with stp works project of taricharkalan town under sbm 2.0
Interception and di of nallahs with stp works project of taricharkalan town under sbm 2.0
Read moreConstruction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreAAAAAAAAAA
Login to viewPollution abatement of sewerage project including construction of stp,mps, (sps), sewer network and allied&#x0d works at added area of kalyani municipal town for ward nos. 1,2,3 (partially) and 14 (phase 1).
Read moreInvestigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in faridpur npp
Investigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreof your Industry type