Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A/R And M/O To Various Roads Under Sub Division East Road Iv Of Pwd Division East Roads, Delhi During 2023 24. (Sh Repair Of Toe Wall Under Mayur Vihar Extension Flyover And Minor Repair Work At Fob (2 Nos) At U.P Link Road, Providing And Applying..
|
| Description |
A/R And M/O To Various Roads Under Sub Division East Road Iv Of Pwd Division East Roads, Delhi During 2023 24. (Sh Repair Of Toe Wall Under Mayur Vihar Extension Flyover And Minor Repair Work At Fob (2 Nos) At U.P Link Road, Providing And Applying..
|
| Organisation | Government of NCT of Delhi |
| Tender Id | 2023_PWD_246536_1 |
|
Reference Number |
39/EE/East Road(M-212)/PWD/2023-24 |
| Tender Fee | 0 |
| EMD | 1.71 Lakh |
| Tender Value | - |
| Place | Executive Engineer, East Road (M-212) |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in |
| Start Date | August 24, 2023 00:25 |
| End Date |
Expired
31/08/2023
Expired 1141 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Read moreA/r and m/o to various roads under sub-division east road-iv of pwd division east roads/(m-212), delhi during 2024-25. (sh- providing and fixing missing g.i pipe railing over crash barriers of flyovers at nh-24, mayur vihar ph-i, mayur vihar extensio
A/r and m/o to various roads under sub-division east road-iv of pwd division east roads/(m-212), delhi during 2024-25. (sh- providing and fixing missing g.i pipe railing over crash barriers of flyovers at nh-24, mayur vihar ph-i, mayur vihar extensio
Read moreConstruction of 6 lane elevated corridor from mayur vihar flyover, delhi (near chilla regulator) to mp-3 road, noida
Construction of 6 lane elevated corridor from mayur vihar flyover, delhi (near chilla regulator) to mp-3 road, noida (mahamaya flyover) along shahdra drain in distt gautam buddha nagar, u.p.
Read moreConstruction of 6 lane elevated corridor from mayur vihar flyover, delhi (near chilla regulator) to mp-3 road, noida
Construction of 6 lane elevated corridor from mayur vihar flyover, delhi (near chilla regulator) to mp-3 road, noida (mahamaya flyover) along shahdra drain in distt gautam buddha nagar, u.p.
Read moreImprovement of inner roads at mayur bagh apartment near bangali colony, paschim vihar, delhi.
Improvement of inner roads at mayur bagh apartment near bangali colony, paschim vihar, delhi.
Read moreComprehensive maintenance of various roads under pwd division south east road-1 during 2026-27. (sh - civil repair works of krishi vihar fob, chirag delhi fob and sheikh sarai fob under jurisdiction of sub division ser-11).
Comprehensive maintenance of various roads under pwd division south east road-1 during 2026-27. (sh - civil repair works of krishi vihar fob, chirag delhi fob and sheikh sarai fob under jurisdiction of sub division ser-11).
Read moreGeneral maintenance contract of line-7 from mayur vihar ph-1 to shiv vihar metro station including viaduct, rss, ancillary buildings, fob, vinod nagar depot and vinod nagar staff quarters.
General maintenance contract of line-7 from mayur vihar ph-1 to shiv vihar metro station including viaduct, rss, ancillary buildings, fob, vinod nagar depot and vinod nagar staff quarters.
Read moreM/o various schemes under na-ii (east zone).sh-cleaning, sweeping and cutting of grasses of vacant land at dallupura, mayur kunj, kondli gharoli, mayur vihar phase-iii.
M/o various schemes under na-ii (east zone).sh-cleaning, sweeping and cutting of grasses of vacant land at dallupura, mayur kunj, kondli gharoli, mayur vihar phase-iii.
Read morePatch repair of roads in shakumbhari vihar yojna 8 saharanpur
Patch repair of roads in shakumbhari vihar yojna 8 saharanpur
Read morePatch repairing work of roads in siddharth vihar yojna, ghaziabad
Patch repairing work of roads in siddharth vihar yojna, ghaziabad
Read moreof your Industry type