Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authority Engineer For Supervision Of Widening To 2 Lane With Hard Shoulder Configuration Of Mana Ch. 0.00 To Mana Pass Ch. 50.987 Road On Nh 07 Under Bharatmala Pariyojana In The State Of Uttarakhand On Epc Mode
|
| Description |
Consultancy Services For Authority Engineer For Supervision Of Widening To 2 Lane With Hard Shoulder Configuration Of Mana Ch. 0.00 To Mana Pass Ch. 50.987 Road On Nh 07 Under Bharatmala Pariyojana In The State Of Uttarakhand On Epc Mode
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_770401_1 |
|
Reference Number |
NH-07/AP/UK/2022-23/626/AE |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | 0 |
| Place | O/o CE-RO, MoRTH, Dehradun |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 08, 2023 22:30 |
| End Date |
Expired
14/11/2023
Expired 1067 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cs for supervision consultant during onm of 8l ac gf dve nh148n starting at sohna gurugram road nh248a near alipur vill to haryana rajasthan border ch.0.000 to ch.78.800 in haryana on epc mode under bharatmala pariyojana
Cs for supervision consultant during onm of 8l ac gf dve nh148n starting at sohna gurugram road nh248a near alipur vill to haryana rajasthan border ch.0.000 to ch.78.800 in haryana on epc mode under bharatmala pariyojana
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreCs for ae for supervision of balance work of 6l of kagal satara section of nh 48 (old nh4) pkg i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Cs for ae for supervision of balance work of 6l of kagal satara section of nh 48 (old nh4) pkg i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreBalance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConsultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Consultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Read moreAuthority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Authority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Read moreConsultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreAuthority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Authority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Read moreof your Industry type