Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp Rbc Ap 2023 24 Annual Maintenance Removal Of All Obstruction And Providing Arrangements For Ensuring Smooth Water Distribution And During Monsoon In Rb Main Canal Between Ch 10/000 Km 20/000 Km Its Branches , Distributors And Field Chann
|
| Description |
Removal Of Obstructions During Water
Distribution And Other Works For Rb Main Canal
10/000 To 20/000 Km
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_611077_1 |
|
Reference Number |
IRR/PI/TR/6489/2023_5_1_1/1 |
| Tender Fee | 555 |
| EMD | 4228 |
| Tender Value | - |
| Place | Head works sub division Malampuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | October 09, 2023 20:45 |
| End Date |
Expired
16/10/2023
Expired 1091 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General ap 2024 25 mangalam project dam section jungle clearance and de silting of rbc from ch 0 000 to 10 800 km and its branches
General ap 2024 25 mangalam project &#x0d dam section jungle clearance and de silting of&#x0d rbc from ch 0 000 to 10 800 km and its&#x0d branches
Read moreGeneral mp lbc es action plan 2023 24 removal of all obstruction and providing arrangements for ensuring smooth water distribution,cutting of dangerous branches trees and other works between ch 0.000 to td of chulannur canal along with its branches a
General mp lbc es action plan 2023 24 removal of all obstruction and providing arrangements for ensuring smooth water distribution,cutting of dangerous branches trees and other works between ch 0.000 to td of chulannur
Read moreGeneral-mp-rbc ap-2023-24-engaging man mazdoor for cutting trees posing danger on an emergency basis in rb main canal between ch.20/000 km to 32/000 km, its branches, distributaries and field channels and for 2023- 24 second crop and 2024 first crop
The estimate is prepared for cutting trees and branches causing danger along the bunds of main canal 20/000 km to 32/000 km , kinavallur, thenur, mankurussi, mankara, pathirippala, palappuram branch canals
Read moreGeneral ap- 2024 25 mangalam project- dam section engaging labour for water distribution for 2024 25 between 0 000 to 5 400 km of lbc, 0 000 to 10 800 km of rbc and its branches
General ap- 2024 25 mangalam project-&#x0d dam section engaging labour for water&#x0d distribution for 2024 25 between 0 000 to&#x0d 5 400 km of lbc, 0 000 to 10 800 km of rbc&#x0d and its branches
Read moreMangalam project ap 2023 24 mangalam canal mace jungle clearance and desilting of rbc from ch 0 000 to 10 800 and its branches for 2023 24 second crop and 2024 first crop
Earth work, clearing jungle,engaging hydraulic excavator
Read moreGeneral-mp rbc-ap 2023-24-removal of all obstructions and providing arrangements for ensuring smooth water distribution and during monsoon in mankara, pathirippala, palappuram branch canals and its distributaries and its field channels for 2023-24 se
Removal of obstructions along mankara, pathiripala, palappuram branches
Read moreGeneral-mp-rbc-ap-2023-24- am-urgent desilting and removal of vegetative materials from rb main canal between ch 26/000 km to 29/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rb main canal from 20/000 to 26/000 km for second, first crops and as and when required,clearing and desilting
Read moreGeneral-mp-rbc-ap-2023 -24-am-urgent desilting and removal of vegetative materials from rb main canal between ch 26/000 km to 29/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 26/000 to 29/000 km for second, first crops and as and when required clearing,desilting
Read moreGeneral-mp-rbc- ap-2023-24-am-urgent desilting and removal of vegetative materials from rb main canal between ch 29/000 km to 32/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rb main canal between ch 29/000 and 32/000 km for second crop, first crop and as and when required
Read moreGeneral-mp-rbc-mansoon preparednessfor the year 2025-26 cutting trees and branches from canal bund ch0/550 km to 20/000 km of rbc and its branch canals,cleaning field channel atch7/000 km of rbc and ut at ch0/800 km of puduppariyaram branch canal
The proposed work is scheduled at ch ch0/800&#x0d km of puduppariyaram branch canal,where the&#x0d ut is blocked due obstruction like stones and&#x0d silt inside th ut. manual removal of this from&#x0d the ut is difficult .we need to excavate the soil&#x0d
Read moreof your Industry type