Tender Details
Particulars | Details |
---|---|
Title |
General Mp Rbc Ap 2023 24 Annual Maintenance Removal Of All Obstruction And Providing Arrangements For Ensuring Smooth Water Distribution And During Monsoon In Rb Main Canal Between Ch 10/000 Km 20/000 Km Its Branches , Distributors And Field Chann
|
Description |
Removal Of Obstructions During Water
Distribution And Other Works For Rb Main Canal
10/000 To 20/000 Km
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_611077_1 |
Reference Number |
IRR/PI/TR/6489/2023_5_1_1/1 |
Tender Fee | 555 |
EMD | 4228 |
Tender Value | |
Place | Head works sub division Malampuzha |
Link | https://etenders.kerala.gov.in |
Start Date | October 09, 2023 20:45 |
End Date |
16/10/2023 ( Expired 591 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
General-emergency-mp- rbc-urgent removal of rock by blasting and stacking stone to the edges at rbc main canal ch 6/200 km and removing top slabs and cleaning of cut cover at ch 6/100 km -general civil work
Big rock was fallen from the right side bund&#x0d of rbc main canal at ch 6/200 km. since the&#x0d region was high cutting area, rock was only&#x0d found during canal cleaning process.as the&#x0d rock was huge and it will cause obstruction for&#x0d water distributi
Read moreGeneral-mp-2024-25-renovation of field channel ing from tail end field channel of thenur branch canal from ch 0/000 km to ch0/124 km-general civil work
The work has been included under the plan fund&#x0d for the renovation of the field channels of the&#x0d malampuzha project.the proposed field channel&#x0d of thenur branch canal have been constructed&#x0d long years back. theside walls and foundation of&#x0d the
Read moreGeneral-mp-rbc-ap- 2023-24-urgent rectification of thenur branch canal-and fixation of iron grill between ch 2/000 to 2/100 km-general civil work
This work has been proposed in b/w ch 2/000&#x0d km to 2/100 km of thenur branch canal
Read moreGeneral removal of floating general removal of floating clearing obstructions and floating for the smooth flow of water during water distribution 2025 in all the canals of kip rb section no41 26 karunagappally
General removal of floating &#x0d general removal of floating &#x0d clearing obstructions and floating for the&#x0d smooth flow of water during water distribution&#x0d 2025 in all the canals of kip rb section&#x0d no41 26 karunagappally
Read moreGeneral-mp-2024-25-renovation works to the mankara branch canal from ch 5/850 km to 5/900 km-general civil work
Mankara branch canals side walls-cut and&#x0d cover portion- were damaged during the 2023-&#x0d 2024 water distribution for the second crop&#x0d period and the well at 6/000 km of mankara&#x0d branch canal were blocked. the block was&#x0d removed and water distribution
Read moreGeneral kyip acp np 2024 25 urgent works for jungle clearance and silt removal of right bank main canal from ch 20 000 km to 27 000km general civil work
Kyip acp np 2024 25 urgent works for jungle clearance and silt removal of right bank main canal from ch 20 000 km to 27 000km
Read moreGeneral-kyip-acp(np) 2024-25-urgent works for jungle clearance and silt removal of ayanikkad branch canal and its field boothies between ch 0/000 km to tail end general civil work
General-kyip-acp(np) 2024-25-urgent&#x0d works for jungle clearance and silt removal of&#x0d ayanikkad branch canal and its field boothies&#x0d between ch 0/000 km to tail end.-general&#x0d civil work
Read moreAm water distribution works of lbmc and all distributaries between ch 33/000 km to 42/000 km for the year 2024 25
Am water distribution works of lbmc and all distributaries between ch 33/000 km to 42/000 km for the year 2024 25
Read moreGeneral-kpip-am-jungle clearance ,silt removal and canal cleaning works of lbmc between ch 33/000 km to 38/700 km for the year 2024-25-general civil work
General-kpip-am-jungle clearance ,silt&#x0d removal and canal cleaning works of lbmc between ch 33/000 km to 38/700 km for the year 2024-25-general civil work
Read moreGeneral-kpip-am jungle clearance ,silt removal and canal cleaning works of lbmc between ch 38/700 km to 42/000 km for the year 2024-25-general civil work
General-kpip-am jungle clearance ,silt&#x0d removal and canal cleaning works of lbmc between ch 38/700 km to 42/000 km for the year 2024-25-general civil work
Read moreof your Industry type