Tender Details

Particulars Details
Title
Loading/ Unloading, Painting, Adjusting, &Amp Testing Accuracy Of 20kg &Amp 10 Kg Ci Test Weights, Issue Of Verification Certificate By State Legal Metrology Department, Odisha As Per Weights Measure Act &Amp Rule Including Providing Labour For Calibration And Stamping Of Test Rake For In Motion Weigh Bridge At Khurda Road.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73983686
Reference
Number
eT-M-CI-TW-KUR-227-2024
Tender Fee 0
EMD 30200
Tender Value
Place Bhubaneswar
Link https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73983686/viewNitPdf_4502040.pdf
Start Date March 06, 2024 18:07
End Date

27/03/2024 ( Expired 439 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Annual calibration of 02 nos. of road weightridges with c.i. test weights at dbocp for annual verification and stamping of the weighbridges by legal metrology department

Annual calibration of 02 nos. of road weightridges with c.i. test weights at dbocp for annual verification and stamping of the weighbridges by legal metrology department

Read more
Cleaning, testing and calibration of ci test weights 20 kg each for annual verification and stamping of 140mt ,in-motion rail weighbridge installed at topa project under kuju area.

Cleaning, testing and calibration of ci test weights 20 kg each for annual verification and stamping of 140mt ,in-motion rail weighbridge installed at topa project under kuju area.

Read more
Amc arrangement for annual stamping of orion make,50 mt capacity electronic road weighbridge and cleaning ,testing and adjusting of 1250 nos 20kg each ci test weights for annual verification and stamping oat ara colliery.

Amc arrangement for annual stamping of orion make,50 mt capacity electronic road weighbridge and cleaning ,testing and adjusting of 1250 nos 20kg each ci test weights for annual verification and stamping at ara colliery.

Read more
Cleaning, testing, adjusting of c.i. test weights to 20kg for annual verification and stamping of 3 numbers of road weigh bridges (wb- 01, 02 and 13) installed at magadh ocp m-s area

Cleaning, testing, adjusting of c.i. test weights to 20kg for annual verification and stamping of 3 numbers of road weigh bridges (wb- 01, 02 and 13) installed at magadh ocp m-s area

Read more
Cleaning, testing and adjusting of 3000 nos. of 20 kg each ci test weights for annual verification and stamping of 01 no. 60mt capacity electronic road wb make tycoon and 01 no. of 120 te in-motion rail wb make ricelake under dakra project, nk area

Cleaning, testing and adjusting of 3000 nos. of 20 kg each ci test weights for annual verification and stamping of 01 no. 60mt capacity electronic road wb make tycoon and 01 no. of 120 te in-motion rail wb make ricelake under dakra project, nk area

Read more
Cleaning, testing, adjusting of c.i. test weights to 20kg for verification and stamping of 3 numbers of road weigh bridges (wb- 01, 02 and 13) installed at magadh ocp m-s area

Cleaning, testing, adjusting of c.i. test weights to 20kg for verification and stamping of 3 numbers of road weigh bridges (wb- 01, 02 and 13) installed at magadh ocp m-s area

Read more
Cleaning, testing, adjusting of c.i. test weights 20kg for verification and stamping of 2 numbers of newly installed 100 mt capacity road weigh bridge (proposed weighbridge no. 22 and 23) at chamatu under magadh ocp m-s area

Cleaning, testing, adjusting of c.i. test weights 20kg for verification and stamping of 2 numbers of newly installed 100 mt capacity road weigh bridge (proposed weighbridge no. 22 and 23) at chamatu under magadh ocp m-s area

Read more
Loading and unloading of 20 tone ci test weight during annual stamping in front of inspector legal metrology for 04 nos. road weighbridge of kusunda area.

Loading and unloading of 20 tone ci test weight during annual stamping in front of inspector legal metrology for 04 nos. road weighbridge of kusunda area.

Read more
Verification and re-calibration of 26 nos. storage tanks in petrochemical plants uc and obtaining stamping from legal metrology department, government of kerala, as per standards of weights and measures enforcement govt. of kerala, rule 2012

Verification and re-calibration of 26 nos. storage tanks in petrochemical plants uc and obtaining stamping from legal metrology department, government of kerala, as per standards of weights and measures enforcement govt. of kerala, rule 2012

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise