Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Dirty Water Pipe Line From H/O Randhir To Parm Al Nath,Village Kanhora, Block Jatusana, Scheme Pmagy
|
Description |
Laying Of Dirty Water Pipe Line From H/O Randhir To Parm Al Nath,Village Kanhora, Block Jatusana, Scheme Pmagy
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 11860 |
Tender Value | |
Place | KANHORA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 01, 2025 20:30 |
End Date |
16/05/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreNiet no. - 01 of the fy 2025-2026 of the ae/bsd, phe dte.(sl.no-05)
Laying of hdpe pipe line to increase pressure at junbedia gajantala and bagdipara for augmentation of harialgora (zone - o) under bankura - i, ii and barjora block w/s scheme (brgf ph - i project)
Read moreRe routing of water supply pipe line of 200mm dia. at western sector.
Re routing of water supply pipe line of 200mm dia. from pcr jn. pump house to ins dega along nhai fly over bridge of visakhapatnam port authority junction in western sector.
Read moreArchitectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreRepair/replacement of gi/ci/ac water supply distribution pipe lines, cleaning of main reservoir, water sump, bp tanks and other connected works including cleaning of water channel from water main reservoir to ekko khad yol mil stn
Repair/replacement of gi/ci/ac water supply distribution pipe lines, cleaning of main reservoir, water sump, bp tanks and other connected works including cleaning of water channel from water main reservoir to ekko khad yol mil stn
Read moreConst of drainage system from campus to existing canal of state govt (bihar) near village and beautification of existing nalah and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar(bihar)
Const of drainage system from campus to existing canal of state govt (bihar) near village and beautification of existing nalah and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar(bihar)
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreof your Industry type