Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Maintenance Including Incident Management Of Two Laning With Paved Shoulders Of Thanjavur To Pudukkottai Section From Km 174.000 To Km 229.228 Of Nh36 In The State Of Tamil Nadu On Item Rate Basis (2nd Call)
|
Description |
Annual Maintenance Including Incident Management Of Two Laning With Paved Shoulders Of Thanjavur To Pudukkottai Section From Km 174.000 To Km 229.228 Of Nh36 In The State Of Tamil Nadu On Item Rate Basis (2nd Call)
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_203389_1 |
Reference Number |
NHAI/17011/01/95/2024/RO Madurai |
Tender Fee | 25000 |
EMD | 9.68 Lakh |
Tender Value | |
Place | Thanjavur to Pudukkottai |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=224694 |
Start Date | August 21, 2024 16:30 |
End Date |
30/08/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read more4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)
4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreConstruction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreImprovement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Improvement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreof your Industry type