Tender Details

Particulars Details
Title
General Pre Monsoon Work 2024 25 For 9 Nos Road Strecthes Under Pwd Roads Section, Valappad In Thrissur District .For A Length Of 48.755 Km
Description
General Pre Monsoon Work 2024 25 For 9&Amp#X0d Nos Road Strecthes Under Pwd Roads Section,&Amp#X0d Valappad In Thrissur District .For A Length Of&Amp#X0d 48.755 Km
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_678762_1
Reference
Number
PWD/RB/2383/2024-2025
Tender Fee 1120
EMD 12692
Tender Value
Place CHAVAKKAD
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1055564
Start Date July 02, 2024 19:30
End Date

08/07/2024 ( Expired 362 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years

Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years

Read more
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise