Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
M/O Completed Scheme (Uer I,Ii,Iii) Under Nazul Ac Ii,Narela Zone.
|
| Description |
Repair Of S.W Drain Along Footpath On Uer I From Gt Karnal Road To Of Flyover (Karnal Side), Improvement Of Footpath Along Flyover And At Nh 44 Approach Road ,Repair Of Parapet Wall (Delhi Side), Etc. On 80m R/W Road Uer I.
|
| Organisation | Delhi Development Authority | Central Govt. Ministry/Department |
| Tender Id | 2024_DDA_797033_1 |
|
Reference Number |
60/EE/NPD-4/DDA/2023-24 |
| Tender Fee | 0 |
| EMD | 3.8 Lakh |
| Tender Value | - |
| Place | NARELA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=837793 |
| Start Date | February 23, 2024 20:30 |
| End Date |
Expired
29/02/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreM/o completed scheme (uer-i, ii and iii), nazul ac-ii (narela zone).
Supply and sprinkling of water through gps enabled hydraulic operated sprinkler on truck mount system (bs-vi complied ) water tanker of capacity not less than 7000 lt. for sprinkling water lets along 80 m r/w road (uer-i) from nh-1 to western yam
Read moreM/o completed scheme (uer-i, ii and iii), nazul ac-ii (narela zone).
Clearing of grass, removal of rubbish, surface dressing and desilting of drain from nh-1 to western yamuna canal on 80 m r/w road (uer-1).
Read moreM/o completed scheme (uer-i, ii and iii) under nazul ac-ii (narela zone).
Patch work and filling of potholes from narela-bawana flyover to western yamuna canal (w.y.c.) at uer-1.
Read moreM/o of completed scheme under (uer-i,ii and iii), nazul ac-ii (narela zone)
Deployment of environmental assistant for cleaning and sweeping of 80m r/w road (uer-i),ing from nh-44 to 40 m r/w road and from bharat mata school to w.y.c.
Read moreM/o completed scheme uer-i, ii and iii under nazul a/c-ii narela zone
Painting of flyover cum rob on uer-i at narela.
Read moreM/o completed scheme uer-i, ii and iii under nazul a/c-ii, narela zone
Clearing of grass, removal of rubbish, surface dressing and desilting of drains from nh-1 to western yamuna canal on 80 m r/w road (uer-1)...
Read moreM/o completed scheme (uer-i, ii and iii), nazul ac-
Surface dressing and removal of malba from uer-i
Read moreM/o completed scheme (uer i,iiandiii) under nazul a/c-ii narela zone.
Providing and laying bituminous concrete, road marking on 80m r/w road (uer-i) from 40m r/w road on uer-i (80m r/w)
Read moreof your Industry type