Particulars | Details |
---|---|
Title |
Condition Assessment Of Critical Rcc Structures Of U 1, Stage I(2x800 Mw) At Ntpc Gadarwara During Unit Overhauling/Shutdown Period
|
Description |
Condition Assessment Of Critical Rcc Structures Of U 1, Stage I(2x800 Mw) At Ntpc Gadarwara During Unit Overhauling/Shutdown Period
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2025_NTPC_97401_1 |
Reference Number |
NTPC/USSC-CPG2/9900301631 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Gadarwara STPP |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=100611 |
Start Date | May 30, 2025 17:30 |
End Date |
07/06/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreWork contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Work contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Read moreWork contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month
Read moreTn-11172 supply of alloy ci fittings, spares for bottom ash hopper and fly ash system of ash handling plant stage, i to v, unit 1 to 7, kstps, kota.
Supply of alloy ci fittings, spares for bottom ash hopper and fly ash system of ash handling plant stage, i to v, unit 1 to 7, kstps, kota.
Read moreRepair to brick works, plaster, fencing and rcc cols, beams of boundary wall at certain mes installation under the aor of age w/s-ii and age e/s-ii area under age (i) (u) b/r, delhi cantt-10
Repair to brick works, plaster, fencing and rcc cols, beams of boundary wall at certain mes installation under the aor of age w/s-ii and age e/s-ii area under age (i) (u) b/r, delhi cantt-10
Read moreContract for candi related jobs of turbine, tdbfps, generator and other ancillary areas during unit-3 overhauling at sgtpp.
Contract for candi related jobs of turbine, tdbfps, generator and other ancillary areas during unit-3 overhauling at sgtpp.
Read moreTtps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Read moreConstruction of library 1 one unit at tuikormo hs school under bokafa block of pm shri scheme during the year 2024-25.
Construction of library 1 one unit at tuikormo hs school under bokafa block of pm shri scheme during the year 2024-25.
Read moreMaking of rcc sump pit for accumulation of overflow ash water along with raising of floor of ash slurry ph and drainage system revival at stage-i, ktps
Making of rcc sump pit for accumulation of overflow ash water&#x0d along with raising of floor of ash slurry ph and drainage system&#x0d revival at stage-i, ktps
Read moreCtps i operation circle ca dn capital overhauling of 6 point 6 kv 1050 kw ht motors of cooling water pumps 1c 2c 2a and 1 no breakdown works any running pump during the year 2025 26
Ctps i operation circle ca dn capital overhauling of 6 point 6 kv 1050 kw ht motors of cooling water pumps 1c 2c 2a and 1 no breakdown works any running pump during the year 2025 26