Tender Details

Particulars Details
Title
Improvement And Maint Of Water Supply Distribution System In Over Head Tanks Residential Bldgs And Other Misc Works At Nams
Description
Improvement And Maint Of Water Supply Distribution System In Over Head Tanks Residential Bldgs And Other Misc Works At Nams &#X0d Under Ge Nams&#X0d
Organisation E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department
Tender Id 2024_MES_636590_1
Reference
Number
CWE/ASR-53/2023-24
Tender Fee 1000
EMD 1.95 Lakh
Tender Value
Place GE NAMS
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=721292
Start Date March 12, 2024 21:30
End Date

18/03/2024 ( Expired 455 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Provn of additional toilet block and allied works for living in billets at af stn vadodara

Provn of additional toilet block and allied works for living in billets at af stn vadodara

Read more
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of &#x0d property development buildings in land parcels at existing mandaveli bus &#x0d depot and terminus including civil, architectural finishes, plumbing, e and m, &#x0d hvac, lifts and all associated works

Read more
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur

Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur &#x0d &#x0d

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise