Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bt Renewal Work Of Sunwaha To Chartoriya Road Length 4.20 Km.
|
Description |
Bt Renewal Work Of Sunwaha To Chartoriya Road Length 4.20 Km.
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10700 |
EMD | 59330 |
Tender Value | |
Place | Raisen |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 00:25 |
End Date |
18/07/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Read moreConstruction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh on epc mode
Construction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh on epc mode
Read moreConstruction of trumpet interchange at km 665.650 of nh-16 excluding already constructed overpass for providing connectivity to bhogapuram international airport in the state of andhra pradesh on epc mode
Construction of trumpet interchange at km 665.650 of nh-16 excluding already constructed overpass for providing connectivity to bhogapuram international airport in the state of andhra pradesh on epc mode
Read moreOne time improvement in bhandara city section of nh-53 (old nh-6) from km 489.646 (design ch. 0.616) to km 498.100 design ch. 9.200 in the state of maharashtra on epc mode.
One time improvement in bhandara city section of nh-53 (old nh-6) from km 489.646 (design ch. 0.616) to km 498.100 design ch. 9.200 in the state of maharashtra on epc mode.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreof your Industry type