Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Appointment Of Agency For Providing New Service Connection With Infra Extension Upto 150 Kw (Nsc Phase Iii) In Electric Supply Circle Patna Under Jurisdiction Of Sbpdcl In Bihar Under “New Service Connection Phase Iii Scheme”.
|
| Description |
Appointment Of Agency For Providing New Service Connection With Infra Extension Upto 150 Kw (Nsc Phase Iii) In Electric Supply Circle Patna Under Jurisdiction Of Sbpdcl In Bihar Under “New Service Connection Phase Iii Scheme”.
|
| Organisation | Government of Bihar | eProc2 Bihar |
| Tender Id | 138258 |
|
Reference Number |
73/PR/SBPDCL/2026 |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | Bihar |
| Link |
View Original Tender Notice
https://eproc2.bihar.gov.in/EPSV2Web/openarea/tenderListingPage.action |
| Start Date | August 24, 2026 11:30 |
| End Date |
Expired
15/09/2026
Expired 32 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of 3 phase power supply of load 30 kw for baghalati irrigation project including service connection at baghalati dam site, nuagada.
Provision of 3 phase power supply to baghalati dam.
Read morePrepaid energy meters 1 phase(upto 5kw load) & 3 phase( >5kw upto =<50kw load) to feed power supply for new connections to the vendors and others on 24 hours basis for 5 years(single ph meter=300 nos. & 3 ph meter=20 nos.)(ph-iii)
Prepaid energy meters 1 phase(upto 5kw load) & 3 phase( >5kw upto =<50kw load) to feed power supply for new connections to the vendors and others on 24 hours basis for 5 years(single ph meter=300 nos. & 3 ph meter=20 nos.)(ph-iii)
Read moreVirar - joravasan (i) trr(p)-9.35km. (ii) tfr-64.705 tkm, renewal of mk-iii erc-23116 nos. & tbr (p&c)-25sets. (iii) track work in connection of extension of existing platform no. 4/5 upto 600m at dahanu road.
Virar - joravasan (i) trr(p)-9.35km. (ii) tfr-64.705 tkm, renewal of mk-iii erc-23116 nos. & tbr (p&c)-25sets. (iii) track work in connection of extension of existing platform no. 4/5 upto 600m at dahanu road.
Read moreSupply, installation, testing and commissioning of telecom gears in connection with (i) bhavnagar terminus: redevelopment of station (ii) bhavnagar terminus: bvc yard remodelling and improvement of interlocking (iii) lothal bhurkhi: redevelopment of station (phase-i) (iv) bhavnagar para: improvement, renovation and extension of railway museum near drm office. (v) bhavnagar para- construction of sr. dsc-rpf-bvp office building.
Supply, installation, testing and commissioning of telecom gears in connection with (i) bhavnagar terminus: redevelopment of station (ii) bhavnagar terminus: bvc yard remodelling and improvement of interlocking (iii) lothal bhurkhi: redevelopment of station (phase-i) (iv) bhavnagar para: improvement, renovation and extension of railway museum near drm office. (v) bhavnagar para- construction of sr. dsc-rpf-bvp office building.
Read moreConstraction of apron phase-iii at patna airport.
Construction of new domestic terminal building and
 other allied structures (phase-i and ii) at jpni airport, patna. sh- construction
 of apron (phase-iii) at patna airport.
Read moreElectrification work at main road thandla under cm urban infra scheme phase-iii
Electrification work at main road thandla under cm urban infra scheme phase-iii
Read moreSquirrel cage induction geared motor, power: 0.37 kw, phase: 3, voltage: 415v(± 10% ) , connection
Read more
Nit for repairing of burnt/defective power transformer (pt) 33/11 kv 3 phase 5 mva & up to 10 mva capacity at transformer repairing workshop, patna, gaya ji and barun under sbpdcl
Nit for repairing of burnt/defective power transformer (pt) 33/11 kv 3 phase 5 mva & up to 10 mva capacity at transformer repairing workshop, patna, gaya ji and barun under sbpdcl
Read moreInstallation of electric connection,single phase energy meter 1 kw,service line for power connectio
Read more
O and m and comprehensive annual maintenance contract (camc) of ris stations under phase-iii (patna to varanasi).
O and m and comprehensive annual maintenance contract (camc) 
 of ris stations under phase-iii (patna to varanasi).
Read moreof your Industry type