Tender Details
Particulars | Details |
---|---|
Title |
Covering Tar Felt Sheet In The Chilled Water Pipeline Providing And Covering New
|
Description |
Covering Tar Felt Sheet In The Chilled Water Pipeline Providing And Covering New&Amp#X0d
Water Proof Tar Felt Sheet In The Various Dia Of Chilled Water Pipe Line And Tieing Chicken Mesh&Amp#X0d
In Terrace Of Administrative Block C And E Of Klc Thiruvananthapuram&Amp#X0d
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_662966_1 |
Reference Number |
7/AEEMECHKLC/ET/2023-24 |
Tender Fee | 2000 |
EMD | 22100 |
Tender Value | |
Place | KLC |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1027983 |
Start Date | February 24, 2024 16:30 |
End Date |
02/03/2024 ( Expired 446 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 400 seater working women hostel
Construction of 400 seater working women hostel at new shillong township, mawdiangdiang, and 200 seater each working women hostel at jowai,byrnihat, tura in meghalaya
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreIndependent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreWidening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreof your Industry type