Tender Details

Particulars Details
Title
Construction Of New Compound Wall Building Water Proofing, Fixing Paving Blocks In Premises And Allied Works, At Babhulgaon Phsc, Village Babhulgaon Bk Tq Vaijapur
Description
Construction Of New Compound Wall Building Water Proofing, Fixing Paving Blocks In Premises And Allied Works, At Babhulgaon Phsc, Village Babhulgaon Bk Tq Vaijapur Dpc General 20242025, 22101058
Organisation RDD-CEO-AURANGABAD | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 500
EMD 10000
Tender Value
Place GP BABHULGAON BK
Link

AAAAAAAAAA

Login to view
Start Date June 05, 2025 18:30
End Date

10/06/2025 ( 3 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj

80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj

Read more
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Read more
Repair replacement of unserviceable lightening

Repair replacement of unserviceable lightening &#x0d protection system flame proof fittings and allied maint works in &#x0d tech/domestic area at mil stn dappar

Read more
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work

Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise