Tender Details

Particulars Details
Title
Replacement Of Damaged Rubber Buffer With Damaged Base Frame Of Electromagnetic Vibrofeeder Of 120 D, 120 E And 120 H Of R And P Gate Along With Feeding Discharge Chute Of Raw Coal Bunker Main Plant Of Kw
Description
Replacement Of Damaged Rubber Buffer With Damaged Base Frame Of Electromagnetic Vibrofeeder Of 120 D, 120 E And 120 H Of R And P Gate Along With Feeding Discharge Chute Of Raw Coal Bunker Main Plant Of Kw
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_337297_1
Reference
Number
PO/KW/E-TENDER/25-26/02 , Date 10.06.2025
Tender Fee 0
EMD 4200
Tender Value
Place KEDLA WASHERY
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349660
Start Date June 11, 2025 15:30
End Date

21/06/2025 ( Expired 14 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Replacement of damaged base of tail end drum by fabrication and erection of new base along with replacement of defective tail end drum of feeder breaker 1 and 2 of phularitand, amp colliery.

Replacement of damaged base of tail end drum &#x0d by fabrication and erection of new base along &#x0d with replacement of defective tail end drum of &#x0d feeder breaker 1 and 2 of phularitand, amp &#x0d colliery.

Read more
Repairing/fabrication of damaged base plate with replacement of damaged main flight bars chain with flight /scrapper bars and other related jobs of atlas copco make feeder breaker at dbocp/nlocp.

Repairing/fabrication of damaged base plate with replacement of damaged main flight bars chain with flight /scrapper bars and other related jobs of atlas copco make feeder breaker at dbocp/nlocp.

Read more
Dismantling, repairing/ strengthening and replacement of damaged parts of unit 203-a rotary breaker along with alignment of its complete body at rom section of moonidih coal washery.

Dismantling, repairing/ strengthening and replacement of damaged parts of unit 203-a rotary breaker along with alignment of its complete body at rom section of moonidih coal washery.

Read more
Dismantling, fabrication/erection of double roll crusher outer cover, feed chute, discharge chute and platform gate work in main washing plant of sawang washery.

Dismantling, fabrication/erection of double roll crusher outer cover, feed chute, discharge chute and platform gate work in main washing plant of sawang washery.

Read more
Replacement of damaged rubber buffer with damaged base frame of electromagnetic vibrofeeder of 120d, 120e and 120h of r and p gate along with feeding discharge chute of raw coal bunker main plant of kw

Replacement of damaged rubber buffer with damaged base frame of electromagnetic vibrofeeder of 120d, 120e and 120h of r and p gate along with feeding discharge chute of raw coal bunker main plant of kw

Read more
Maintenance by replacement of rubber seals and applying anticorrosive coal tar black paint to radial gate 5.5 x 4.5m- 4 nos. including hoist bridge along with applying flat oil paint to its railing, staircase railing of cr cum escape gates rd-90000m,

Maintenance by replacement of rubber seals and applying anticorrosive coal tar black paint to radial gate 5.5 x 4.5m- 4 nos. including hoist bridge along with applying flat oil paint to its railing, staircase railing of cr cum escape gates rd-90000m,

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.

Read more
Replacement of damaged trench covers and stone masonary boundary wall of sen nursing home and delhi gate in main plant area at pragati power station 1

Replacement of damaged trench covers and stone masonary boundary wall of sen nursing home and delhi gate in main plant area at pragati power station-1

Read more
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Read more
Complete maintenance along with painting and replacement of all rubber seals of intake gate of machine no. 01, 02 and 03 of sheetla power house, moth, jhansi

Complete maintenance along with painting and replacement of all rubber seals of intake gate of machine no. 01, 02 and 03 of sheetla power house, moth, jhansi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise