Tender Details

Particulars Details
Title
Widening And Strengthening Of Jhinjhak Kanchausi Canal Patri Road (Odr) Upto 3.00 Meter To 5.50 Meter (Including 05 Years Maintenance.)
Description
Widening And Strengthening Of Jhinjhak Kanchausi Canal Patri Road (Odr) Upto 3.00 Meter To 5.50 Meter (Including 05 Years Maintenance.)
Organisation Cheif Engineer Kanpur Zone PWD Kanpur | State Govt. and UT
Tender Id 2025_CEKNP_991661_1
Reference
Number
7580C/131C-KV/2024 DT. 30.12.2024
Tender Fee 7714
EMD 25.1 Lakh
Tender Value
Place Kanpur Dehat
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1751805
Start Date January 13, 2025 14:30
End Date

22/01/2025 ( Expired 126 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Grant of license for supply, installation, commissioning, operation and maintenance of 01 no. 100 ton capacity hmcs for a period of 05 years.

Grant of license for supply, installation, commissioning, operation and maintenance of 01 no. 100 ton capacity hmcs for a period of 05 years.

Read more
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of pcc road widening and rcc drain with precast from saroj shah house to main road at ward no.30

Construction of pcc road widening and rcc drain with precast from saroj shah house to main road at ward no.30

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise