Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
R Replacement Of Steel Girder 1x9.15m With Psc Slab On Bridge No.15 (Up &Amp Dn) At Km 1531/30 G 32 G Between Hnzm I Ind Yamuna Bridge On Gal Section Under Aden/Hnzm, Replacement Of Steel Girder 1x7.46m With Psc Slab On Bridge No.8 A (Up &Amp Dn) At Km 6.74 Between Lpnr Dsj On Dal Section Under Aden/Hnzm And Replacement Of Steel Girder With Psc Slab Of Br.No.4 North Line (1 X4.60m1 X4.25m) Between Dli Dee, Br.No.18 North Line (1 X3.05m) And Br.No.20 North Line(1 X3.05m) Between Ptnr Dec Under Aden
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75699504 |
|
Reference Number |
05-A-2024-25-WV |
| Tender Fee | 0 |
| EMD | 2.27 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/082024/75699504/viewNitPdf_4607279.pdf |
| Start Date | July 24, 2024 16:49 |
| End Date |
Expired
16/08/2024
Expired 790 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ohe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Ohe modification work in connection with replacement of steel girder by psc slab at bridge no. 31dn & 76dn and providing extra water way at bridge no. 60 under aden(vya) section in udn-jl section of mumbai division of western railway.
Read moreOhe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read moreProvision of side pathway to 14 nos. psc girder bridges (49 spans) in between lpg-dfr & hatb-hnpa sections under the jurisdiction of sse/bridge/sambalpur of sambalpur division.
Provision of side pathway to 14 nos. psc girder bridges (49 spans) in between lpg-dfr & hatb-hnpa sections under the jurisdiction of sse/bridge/sambalpur of sambalpur division.
Read moreReplacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Read more1)rebuilding of major bridge no. 35 (10x12.20m) between lku-gub station &2)rebuilding of major bridge no. 101 (6x12.20m) between bazpur-hempur ismile station using psc slabs on well foundation in lalkuan-kashipur section in jurisdiction of aden/kpv in izn division of n.e. railway.
1)rebuilding of major bridge no. 35 (10x12.20m) between lku-gub station &2)rebuilding of major bridge no. 101 (6x12.20m) between bazpur-hempur ismile station using psc slabs on well foundation in lalkuan-kashipur section in jurisdiction of aden/kpv in izn division of n.e. railway.
Read moreC/o 35.00 metresapn psc girder bridge over shamshar khad at rd 0/100 on shamshar to panei road km 0/000 to 9/390
C/o 35.00 metresapn psc girder bridge over shamshar khad at rd 0/100 on shamshar to panei road km 0/000 to 9/390
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read moreof your Industry type