Tender Details
Particulars | Details |
---|---|
Title |
R Replacement Of Steel Girder 1x9.15m With Psc Slab On Bridge No.15 (Up &Amp Dn) At Km 1531/30 G 32 G Between Hnzm I Ind Yamuna Bridge On Gal Section Under Aden/Hnzm, Replacement Of Steel Girder 1x7.46m With Psc Slab On Bridge No.8 A (Up &Amp Dn) At Km 6.74 Between Lpnr Dsj On Dal Section Under Aden/Hnzm And Replacement Of Steel Girder With Psc Slab Of Br.No.4 North Line (1 X4.60m1 X4.25m) Between Dli Dee, Br.No.18 North Line (1 X3.05m) And Br.No.20 North Line(1 X3.05m) Between Ptnr Dec Under Aden
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75699504 |
Reference Number |
05-A-2024-25-WV |
Tender Fee | 0 |
EMD | 2.27 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/75699504/viewNitPdf_4607279.pdf |
Start Date | July 24, 2024 16:49 |
End Date |
16/08/2024 ( Expired 296 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Signalling work in connection with re-girdering of bridge no.3 (rub) between station sdah-bnxr on up & dn sub line and line no. 6 & 7 of sealdah division.
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreThrough rail renewal (primary) along with tfr of existing 60 kg 90 uts rails laid on psc-14 sleeper with new 60 kg 90uts/r260 rails (lwr) for barajamda jn - gua - trr(p) - 4.500 tkm, padapahar - bolanikhadan - trr(p) - 5.500 tkm & padapahar - nayagarh - trr(p) - 28.112 tkm. and 1.595 tr. km on up line at km 331.00 - 332.595 between jnk-tabu section under the jurisdiction of sr.den(south)/ckp.
For complete deion and other details, please refer to tender
Read moreProposed replacement of existing steel girder with psc slabs of br. no. 176 up ( 3 x 9.15 m span ) at km. 86 / 690 in srr - ers section and bridge no. 433 up ( 2 x 9.15 m span) at km. 19/600 - 700 in ers - ktym - kyj section. - balance work
For complete deion and other details, please refer to tender
Read moreDigital twin modeling of railway steel girder bridges with the help of drone and terrestrial lidar based inspection of br. no. 1259 up (8x45.75m), br. no. 1252 dn (10x23.21m) on mb-sre section, br. no. 101 (33x24.4m) on ch-aljn section. br. no. 1125 up (10x30.5m) & br. no. 1137up (10x61m) on be-mb section of mb division
For complete deion and other details, please refer to tender
Read more1) vpy-wst section up line: ctr (p) -0.853 km & trr (p) on br. no. 10 r & 16 r -0.047 km 2) ctr(p)-vlk-anng -3.616 km with 60kg /psc/1660 nos/km between km. 0-3.616 in single line
For complete deion and other details, please refer to tender
Read moreSurface protection by metalizing & painting of steel girder bridges to pr from corrosion of br.no. 14 up & dn, 14 (up & dn) goods line, 29a, 166 dn, 228a up & dn, 228a siding, 414sl, 142sl, 255 up, 154up, 156a up, 189dn, 210 dn, rob naraina, rob-17a, rob-l-xing 227 spl, rob maur, rob noli, 31 gal, 225 dn, 246 dn of dli division.
For complete deion and other details, please refer to tender
Read morePardi - atul section - electrical (power) work in connection with construction of important bridge no. 313 up and down line on new alignment between pardi and atul station in connection with increase of speed to 160 kmph in virar - surat section.
For complete deion and other details, please refer to tender
Read moreSignalling work in conncetion with earth work of construction of important bridge no. 313 up & dn line on new alignment including earthwork, track work and associated civil works (from chainage rly km 188200 to rly km 189 500) between pardi station and atul station in connection with increase of speed to 160 kmph in virar-surat section of mumbai division on western railway.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type