Tender Details
Particulars | Details |
---|---|
Title |
Digging And Renovation Of Kajilia Pond Village Hardoni Block Badokharkhurd Lot 19
|
Description |
Digging And Renovation Of Kajilia Pond Village Hardoni Block Badokharkhurd Lot 19
|
Organisation | Minor Irrigation Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1300 |
EMD | 2.77 Lakh |
Tender Value | |
Place | BANDA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 02, 2025 19:30 |
End Date |
13/05/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreDevelopment of keshod airport, keshod (gujarat)
Detailed designing, engineering, procurement and construction of new domestic terminal building with parking, atc tower cum technical block, fire station, electrical sub-station, approach roads, ancillary structures, allied works and associated mep a
Read moreJp/b957-999-pd-t-8701/1014 - water block package consisting of rwtp, rodmp and zldp of bina petchem and refinery expansion project(bprep)
Water block package consisting of rwtp, rodmp and zldp of bina petchem and refinery expansion project(bprep)
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreConstruction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Construction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Read moreThorough attention of line-7 stations and renovation of toilets-mypi, rg, esih, pbgw, sakp, nshp, smbg.
Thorough attention of line-7 stations and renovation of toilets-mypi, rg, esih, pbgw, sakp, nshp, smbg.
Read moreThorough attention of line-7 stations and renovation of toilets-vnpr, soen, ina, svmb, ddsc, dlic, navr.
Thorough attention of line-7 stations and renovation of toilets-vnpr, soen, ina, svmb, ddsc, dlic, navr.
Read moreConsultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Read moreProvision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Provision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Read moreof your Industry type