Tender Details
Particulars | Details |
---|---|
Title |
Conservation And Development Work Of Sas Bahu Temple, Nagda, Distt. Udaipur
|
Description |
Conservation And Development Work Of Sas Bahu Temple, Nagda, Distt. Udaipur
|
Organisation | Archaeological Survey of India | Central Govt. Ministry/Department |
Tender Id | 2024_ASI_821103_1 |
Reference Number |
09/2024-25 Sas Bahu Temple, Nagda, Udaipur |
Tender Fee | 1000 |
EMD | 1.03 Lakh |
Tender Value | |
Place | Sas Bahu Temple, Nagda, Distt. Udaipur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=862925 |
Start Date | August 13, 2024 23:30 |
End Date |
02/09/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Integrated development of chandrika and gs49 project
Offshore installation and onshore works of 
 integrated development of chandrika and gs49 project
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreRedevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a construction cum development contract by appointment of c and da 2025
Redevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a&#x0d construction cum development contract by appointment of c and da
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreUpgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreDevelopment of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreof your Industry type