Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Materials For Construction Internal Cc Road And Gutter At Pokhari And Construction Of Sant Sevalal Maharaj Sabhagruh At Pokhari Under Tvsy Tal Dharangaon Dist Jalgaon
|
Description |
Cements Bags And Tmt Fe 500 Steel
|
Organisation | RDD-CEO-JALGAON | State Govt. and UT |
Tender Id | 2024_JALGA_1101648_1 |
Reference Number |
JLVP- eTender Pokhari Tanda-01/2024-25 |
Tender Fee | 500 |
EMD | 0 |
Tender Value | |
Place | V P Pokhari under TVSY Tal Dharangaon Dist Jalgaon |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1923735 |
Start Date | October 02, 2024 21:30 |
End Date |
08/10/2024 ( Expired 222 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreSupply, installation, testing and commissioning of table-top afm/stm system for ambient operation with vibration isolation stage and advanced imaging options
Supply,&#x0d installation, testing and commissioning of table-top afm/stm system for ambient operation with&#x0d vibration isolation stage and advanced imaging options at the department of physics, kannur university (under pm usha scheme)
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreConstruction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreSpecial repairs to internal roads of mh secunderabad at certain location and special repairs to road infrastructure from bldg. no. p-12 to near by bldg. no. p-26/c2 of 554 asc bn and special repairs for resurfacing bitumen road , pcc road and approch
Special repairs to internal roads of mh secunderabad at certain location and special repairs to road infrastructure from bldg. no. p-12 to near by bldg. no. p-26/c2 of 554 asc bn and special repairs for resurfacing bitumen road , pcc road and approch
Read moreof your Industry type