Tender Details
Particulars | Details |
---|---|
Title |
Annual Maintenance Of Water Supply Scheme In Sector20 Pii Sirsa Operating Sluice Valve Service For Excavation Of Soil For Removing Of Leakage In Sector19 Pi 20 Pi 20 Pii 20 Piii And Old Bus Stand Sirsa
|
Description |
Annual Maintenance Of Water Supply Scheme In Sector20 Pii Sirsa Operating Sluice Valve Service For Excavation Of Soil For Removing Of Leakage In Sector19 Pi 20 Pi 20 Pii 20 Piii And Old Bus Stand Sirsa
|
Organisation | Government of Haryana |
Tender Id | 2023_HBC_293033_1 |
Reference Number |
JOB NO.92.2023(RE-INVITED) |
Tender Fee | 500 |
EMD | 7236 |
Tender Value | |
Place | Executive Engineer HSVP Division No II Hisar |
Link | https://etenders.hry.nic.in |
Start Date | June 23, 2023 22:40 |
End Date |
06/07/2023 ( Expired 703 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreComprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.
Comprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.
Read morePrequalification of consultant for preparation of detailed project report (dpr) and/ or for project management consultant (pmc) for water supply systems in towns of beyla, koubia, and fria in guinea
Prequalification of consultants for drinking water supply systems in towns of beyla, koubia, and fria project in guinea involving water intake, storage, treatment, pumping and onwards distribution to households
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreBiennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at dumping ground zone-6 raniganj under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at dumping ground zone-6 raniganj under amrut&#x0d 2.0 phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreof your Industry type