Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Exhaust Hood 7x3,Exhaust Hood 5x3,2 Hp Blower,Gi Ducting,Gas Pipeline With Fitting,Transportation
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/4406509 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 18, 2024 16:09 |
| End Date |
Expired
29/01/2024
Expired 992 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | akas distributors | - | 18-01-2024 16:46:19 | N/A | Qualified |
| 2 | JANTA ENGINEERS AND COMPANY | - | 28-01-2024 16:43:07 | N/A | Qualified |
| 3 | KALAM KITCHEN EQUIPMENTS | - | 18-01-2024 12:01:58 | MSE | Qualified |
| 4 | Sunrise Global | - | 18-01-2024 16:53:13 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | KALAM KITCHEN EQUIPMENTS(MSE)( MSE Social Category:OBC ) | Item Categories : Exhaust Hood 7x3,Exhaust Hood 5x3,2 HP Blower,GI Ducting,Gas Pipeline with fitting,Transportation | 221486.00 | L1 |
| 2 | akas distributors | Item Categories : Exhaust Hood 7x3,Exhaust Hood 5x3,2 HP Blower,GI Ducting,Gas Pipeline with fitting,Transportation | 325000.00 | L2 |
| 3 | Sunrise Global | Item Categories : Exhaust Hood 7x3,Exhaust Hood 5x3,2 HP Blower,GI Ducting,Gas Pipeline with fitting,Transportation | 375000.00 | L3 |
| 4 | JANTA ENGINEERS AND COMPANY | Item Categories : Exhaust Hood 7x3,Exhaust Hood 5x3,2 HP Blower,GI Ducting,Gas Pipeline with fitting,Transportation | 3000000.00 | L4 |
Centrifugal exhaust blower,pulley and slash cable,frp enclosure for rain hood
Centrifugal exhaust blower,pulley and slash cable,frp enclosure for rain hood
Read moreRep and maint of ext water supply distribution network inclu replacement of defec gi/ci pipeline, fitting and fixture, overhaul of pump set and motor, mech laundry installation and other allied work at altinho, bambolim and panaji area under ge panaj
Rep and maint of ext water supply distribution network inclu replacement of defec gi/ci pipeline, fitting and fixture, overhaul of pump set and motor, mech laundry installation and other allied work at altinho, bambolim and panaji area under ge panaj
Read moreLaying and fitting ms pipeline 4inch dia from mdtp to rls ground water storage tank with repairing of 10 hp monoblock pump and its auto priming system for dust suppression at rls area and its surrounding at locp, ib valley area.
Laying and fitting ms pipeline 4 inch dia from mdtp to rls ground water storage tank with repairing of 10 hp monoblock pump and its auto priming system for dust suppression at rls area and its surrounding at locp, ib valley area.
Read moreBenchtop icp-ms system - main instrument accessories consumables and software,high-efficiency recirculating water chiller system for icp-ms,fume hood unit 150 cm x 60 cm x 60 cm with exhaust ducting and blower,microwave sample digestion system with rotor and vessels,15 kva true online ups system with isolation transformer and battery bank,computer system with control software led monitor and printer for icp-ms,modular laboratory workbenches and furniture for icp-ms laboratory,triple quadrupole gc-ms or ms system - main instrument accessories consumables and software,high-temperature pyrolyzer unit for advanced polymer and material analysis,instrument gas piping network with regulators tubing and multi-gas control panel,laboratory deep freezer -20 c for sample storage,15 kva true online ups system with isolation transformer and battery bank for gc-ms or ms,computer system with control software led monitor and printer for gc-ms or ms,modular laboratory workbenches and furniture for gc-ms or ms laboratory
Benchtop icp-ms system - main instrument accessories consumables and software,high-efficiency recirculating water chiller system for icp-ms,fume hood unit 150 cm x 60 cm x 60 cm with exhaust ducting and blower,microwave sample digestion system with rotor and vessels,15 kva true online ups system with isolation transformer and battery bank,computer system with control software led monitor and printer for icp-ms,modular laboratory workbenches and furniture for icp-ms laboratory,triple quadrupole gc-ms or ms system - main instrument accessories consumables and software,high-temperature pyrolyzer unit for advanced polymer and material analysis,instrument gas piping network with regulators tubing and multi-gas control panel,laboratory deep freezer -20 c for sample storage,15 kva true online ups system with isolation transformer and battery bank for gc-ms or ms,computer system with control software led monitor and printer for gc-ms or ms,modular laboratory workbenches and furniture for gc-ms or ms laboratory
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreHood 8x4 with ducting,hood 6x3 with ducting,exhaust fan 12 inch,exhaust fan 18 inch,hood filte
Read more
Chemical laboratory fume hood system with ducting, exhaust blower & scrubber(as per specification)
Read more
of your Industry type