Tender Details

Particulars Details
Title
Improvement Of Road From Harirai Para To Surendra Para Under 1 Simna Assembly Constituency During The Year 2024 25/Sh Protection Work, Drainage, Gsb, Wbm 2,Wbm 3, Carpeting Etc. L 1.625 Km (Ch. From 0.00 Km To 1.625 Km).
Description
Improvement Of Road From Harirai Para To Surendra Para Under 1 Simna Assembly Constituency During The Year 2024 25/Sh Protection Work, Drainage, Gsb, Wbm 2,Wbm 3, Carpeting Etc. L 1.625 Km (Ch. From 0.00 Km To 1.625 Km).
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2025_CEPWD_57921_1
Reference
Number
173/R/DNIeT/SE-IV/PWD(R n B)/2024-25
Tender Fee 4000
EMD 2.91 Lakh
Tender Value -
Place Mohanpur
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58909

Start Date February 05, 2025 00:25
End Date
Expired 13/02/2025

Expired 610 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km

Read more
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Read more
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Read more
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.

Read more
Improvement of road from sarat chowdhury para to harirai para under 1-simna assembly consituency during the year 2024-25/sh protection work, wbm-ii, wbm-iii, carpeting, drainage work , cd, retaining wall and earth filling etc (l-1.40 km)

Improvement of road from sarat chowdhury para to harirai para under 1-simna assembly consituency during the year 2024-25/sh protection work, wbm-ii, wbm-iii, carpeting, drainage work , cd, retaining wall and earth filling etc (l-1.40 km)

Read more
Improvement of road from surendra para to nagar para via krishnapur tee estate under 1-simna assembly consituency during the year 2024-25/sh gsb, wbm-iii, carpeting, drainage work , cd, retaining wall and earth filling etc(l-1.50 km)

Improvement of road from surendra para to nagar para via krishnapur tee estate under 1-simna assembly consituency during the year 2024-25/sh gsb, wbm-iii, carpeting, drainage work , cd, retaining wall and earth filling etc(l-1.50 km)

Read more
Improvement of road from belmura to to dugrai para under 1-simna assembly consituency during the year 2024-25/sh protection work, gsb, wbm-iii, carpeting, drain , cd,and earth filling etc (l-1.05 km)

Improvement of road from belmura to to dugrai para under 1-simna assembly consituency during the year 2024-25/sh protection work, gsb, wbm-iii, carpeting, drain , cd,and earth filling etc (l-1.05 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise