Tender Details
Particulars | Details |
---|---|
Title |
Work Contract For Duct Velocity And (Cfd) Analysis Of Flue Gas Ducts From Eco Outlet To Id Fan Inlet Alongwith Design, Manufacture Supply And Erection Of Diverter Plates, Application Of Refractory At Boiler Of 1 X500 Mw Unit
|
Description |
Work Contract For Duct Velocity And (Cfd) Analysis Of Flue Gas Ducts From Eco Outlet To Id Fan Inlet Alongwith Design, Manufacture Supply And Erection Of Diverter Plates, Application Of Refractory At Boiler Of 1 X500 Mw Unit
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6534 |
EMD | 2 Lakh |
Tender Value | |
Place | SGTPS, BIRSINGHPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 17:30 |
End Date |
10/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for duct velocity and (cfd) analysis of flue gas ducts from eco outlet to id fan inlet alongwith design, manufacture supply and erection of diverter plates, application of refractory at boiler of 1x500 mw unit
Work contract for duct velocity and (cfd) analysis of flue gas ducts from eco outlet to id fan inlet alongwith design, manufacture supply and erection of diverter plates, application of refractory at boiler of 1x500 mw unit
Read moreSupply of insulation pads, g.p. sheet and fixing the same over the outer surface of steam, feed water, drain, ibd tank, aph, secondary , primary air ducts, flue gas path from boiler to esp out let gate, outer surface of duct pa,fd,id
Supply of insulation pads, g.p. sheet and fixing the same over the outer surface of&#x0d steam, feed water, drain, ibd tank, aph, secondary , primary air ducts, flue gas path&#x0d from boiler to esp out let gate, outer surface of duct pa,fd,id
Read moreTtps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03
Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03
Read morePre fabrication/modification, erection and hooking up of a portion of 1800 mm ms inlet gas ducts between w4 and new iat and 1800mm ms outlet gas duct between new iat and w5 in connection with hook up of new iat in sa plant, fact-cd.
Pre fabrication/modification, erection and hooking up of a portion of 1800 mm ms inlet gas ducts between w4 and new iat and 1800mm ms outlet gas duct between new iat and w5 in connection with hook up of new iat in sa plant, fact-cd.
Read moreWork of availing expert supervisory services for the overhauling of fd fans, pa fans, id fans and seal air fan installed at boiler side of 1x500 mw unit, at sgtps, mppgcl, birsinghpur.
Work of availing expert supervisory services for the overhauling of fd fans, pa fans, id fans and seal air fan installed at boiler side of 1x500 mw unit, at sgtps, mppgcl, birsinghpur.
Read moreMtps i bm unit ii coh 2024 25 dismantling fabrication and erection of portion of flue gas ducts from economizer outlet to aph inlet of both a and b sides etc
Mtps i bm unit ii coh 2024 25 dismantling fabrication and erection of portion of flue gas ducts from economizer outlet to aph inlet of both a and b sides etc
Read moreMtps i bm unit ii coh 2024 25 fg duct a side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Mtps i bm unit ii coh 2024 25 fg duct a side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Read moreMtps i bm unit ii coh 2024 25 fg duct b side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Mtps i bm unit ii coh 2024 25 fg duct b side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Read moreMtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides
Mtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides
Read moreDesign, supply, erection and commissioning of wet lime based flue gas desulphurisation system for the 1 x 125 tph afbc boiler under rsps 2 at tnpl unit i
Design, supply, erection and commissioning of wet lime based flue gas desulphurisation system for the 1 x 125 tph afbc boiler under rsps 2 at tnpl unit i