Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
C Band 1:2 Lna System With Indoor Redundancy Controller And 100 Meter Control Cable
|
Description |
C Band 1:2 Lna System With Indoor Redundancy Controller And 100 Meter Control Cable
|
Organisation | Electronics Corporation of India Limited | Public Sector Undertakings |
Tender Id | APD-14-8010 |
Reference Number |
APD-14-8010 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Hyderabad |
Link | https://etenders.ecil.co.in/eps/rfq/nitPublishAnonymous.do?nitId=915696 |
Start Date | February 29, 2024 21:04 |
End Date |
14/03/2024 ( Expired 461 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read morePart 1 augmentation and rehablitation of water supply and part 2 extension and augmentation of sewerage network system for sri muktsar sahib south package 1 b district sri muktsar sahib under amrut 2 scheme
Part 1 augmentation and rehablitation of water supply and part 2 extension and augmentation of sewerage network system for sri muktsar sahib south package 1 b district sri muktsar sahib under amrut 2 scheme
Read moreExtension and augmentation of sewerage network system for sri muktsar sahib sewerage north package 1 a under amrut 2 punjab
Extension and augmentation of sewerage network system for sri muktsar sahib sewerage north package 1 a under amrut 2 punjab
Read moreSupply of 2 nos. of gan based c-band sspa with integral l- band buc and remote controller unit for interfacing with the sspa
Supply of 2 nos. of gan based c-band sspa with integral
 l- band buc and remote controller unit for interfacing with the sspa
Read moreNit for supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuilly automatic control of both 02 nos biofermenters
Supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuily automatic control of both 02 nos biofermenters
Read moreRepairing of road with wbm on top of the dyke of ash pond logoon # 1 and 2 at dvc, dstps, andal
Repairing of road with wbm on top of the dyke of ash pond logoon # 1 and 2 at dvc, dstps, andal
Read moreSupply, installation, testing, commissioning and certification of 60 no. of dmis (driver machine interface) compatible with onboard atc system on line-1 and 2.
Supply, installation, testing, commissioning and certification of 60 no. of dmis (driver machine interface) compatible with onboard atc system on line-1 and 2.
Read moreof your Industry type