Tender Details

Particulars Details
Title
Erection Of 3.3 Kv O/H Line From 10 No Substation To Cocp Excavated Patch For Power Supply To Pump And Installation Of 100 Kva, 3.3 Kv/440 V Lighting Transformer Along With Erection Of 440 Volt O/H Line For Lighting At Cocp Pumping Station Of Sarubera
Description
Erection Of 3.3 Kv O/H Line From 10 No Substation To Cocp Excavated Patch For Power Supply To Pump And Installation Of 100 Kva, 3.3 Kv/440 V Lighting Transformer Along With Erection Of 440 Volt O/H Line For Lighting At Cocp Pumping Station Of Sarubera
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_335559_1
Reference
Number
GM (K)/EnM/eTender/25-26/52
Tender Fee 0
EMD 37000
Tender Value -
Place GM UNIT KUJU
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347852

Start Date May 17, 2025 00:25
End Date
Expired 26/05/2025

Expired 509 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing of 750 kva, 11kv 6.6kv 440v, lighting transformer make kva process transformers p ltd at mpl and 500 kva,11kv 440v,make mandb switchgears ltd transformer at nadkhurkee main substation abocp..

Repairing of 750 kva, 11kv 6.6kv 440v, lighting transformer make kva process transformers p ltd at mpl and 500 kva,11kv 440v,make mandb switchgears ltd transformer at nadkhurkee main substation abocp..

Read more
Re-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.

Re-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.

Read more
Repairing and changing of stud bush, gasket and damaged cable etc. of 500 kva lighting transformer, 3.3kv 440volt at thakur colony, 630 kva lighting transformer, 3.3kv 440volt at gayatri colony and 500 kva lighting transformer, 3.3kv 440volt at of

Repairing and changing of stud bush, gasket and damaged cable etc. of 500 kva lighting transformer, 3.3kv 440volt at thakur colony, 630 kva lighting transformer, 3.3kv 440volt at gayatri colony and 500 kva lighting transformer, 3.3kv 440volt at of

Read more
Repairing and changing of stud bush, gaskit and damaged cable etc. of 500kva lighting transformer, 3.3kv/440volt at thakur colony, 630kva lighting transformer, 3.3kv/440 volt at gyatri colony and 500kva lighting transformer, 3.3kv/440volt at officer

Repairing and changing of stud bush, gaskit and damaged cable etc. of 500kva lighting transformer, 3.3kv/440volt at thakur colony, 630kva lighting transformer, 3.3kv/440 volt at gyatri colony and 500kva lighting transformer, 3.3kv/440volt at officer

Read more
Repairing of power transformer 250 kva 3.3kv/440volt 3 phase power feeding to lighting line tina dhouda at bhalgora new pit substation.

Repairing of power transformer 250 kva 3.3kv/440volt 3 phase power feeding to lighting line tina dhouda at bhalgora new pit substation.

Read more
Repairing of 630 kva, 3.3kv/440v, lighting transformer under kathara colliery

Repairing of 630 kva, 3.3kv/440v, lighting transformer under kathara colliery

Read more
Rewinding and con of 315 kva,3.3kv/550v transformer to 11kv/440v 450kva for lighting load at ena colliery substation

Rewinding and con of 315 kva,3.3kv/550v transformer to 11kv/440v 450kva for lighting load at ena colliery substation

Read more
Overhauling, repairing and replacement of damaged gaskets and filtration of transformer oil of one no. 750kva 3.3kv 440v, 2 nos. 100kva 3.3kv 440v, 2 nos. 100kva 550v 440v, 3 nos 50kva 550v 440v and one no. 25kva 3.3kv 440v lighting transformer

Overhauling, repairing and replacement of damaged gaskets and filtration of transformer oil of one no. 750kva 3.3kv 440v, 2 nos. 100kva 3.3kv 440v, 2 nos. 100kva 550v 440v, 3 nos 50kva 550v 440v and one no. 25kva 3.3kv 440v lighting transformer

Read more
Erection of 2km approx 3.3kv overhead line from main substation to main pumping station, including 150 meters of underground ht cable laying, installation of two no of 3.3kv 415 and 3. 3kv/220v transformers and lt overhead line under sarubera project

Erection of 2km approx 3.3kv overhead line from main substation to main pumping station, including 150 meters of underground ht cable laying, installation of two no of 3.3kv 415 and 3. 3kv/220v transformers and lt overhead line under sarubera project

Read more
Re-arrangement of 440volt o/h line near cocp workshop. ob dump and mines and installation of 02 no. lighting tower and light fittings for proper illumination of ob dump and mine of sarubera project under kuju area.

Re-arrangement of 440volt o/h line near cocp workshop. ob dump and mines and installation of 02 no. lighting tower and light fittings for proper illumination of ob dump and mine of sarubera project under kuju area.

Read more
Click Here to Download Dockets