Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
15 Kw Off Grid Standalone Solar Power Plant
|
| Description |
|
| Organisation | Central Armed Police Forces | Ministry of Home Affairs |
| Tender Id | GEM/2025/R/487044 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 14, 2025 16:30 |
| End Date |
Expired
15/05/2025
Expired 520 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Solar system (off grid) with 2 kw dry lithium ion battery
Solar system (off grid) with 2 kw dry lithium ion battery
Read moreOff-grid electrification works in the sambhav villages of dima hasao and west karbi-anglong districts of assam through standalone solar pv system
Site survey, design, engineering, supply, erection, testing and commissioning of shls as per tender document, along with 5 year complete maintenance to all beneficiaries in the sambhav villages of dima hasao and karbi-anglong district of assam
Read moreOff - grid solar photovoltaic (pv) power plant (v2),off - grid solar photovoltaic (pv) power plant (v2)
Off - grid solar photovoltaic (pv) power plant (v2),off - grid solar photovoltaic (pv) power plant (v2)
Read moreOff - grid solar photovoltaic (pv) power plant (v2),off - grid solar photovoltaic (pv) power plant (v2)
Off - grid solar photovoltaic (pv) power plant (v2),off - grid solar photovoltaic (pv) power plant (v2)
Read moreProvn of roof top 20 kw solar power plant off grid with battery backup for mdc agra under ge (east) agra
Provn of roof top 20 kw solar power plant off grid with battery backup for mdc agra under ge (east) agra
Read moreSupply installation testing and commissioning of 50 kw off grid solar pv power plant complete with battery energy storage system at ayodhya
Supply installation testing and commissioning of 50 kw off grid solar pv power plant complete with battery energy storage system at ayodhya
Read moreSupply installation testing and commissioning of 50 kw off grid solar pv power plant complete with battery energy storage system at ayodhya
Supply installation testing and commissioning of 50 kw off grid solar pv power plant complete with battery energy storage system at ayodhya
Read moreSupply and installation of 5.0 kw solar power plant off grid 01 nos at dehradoon public senior secondry school gopal nagar kanpur nagar
Supply and installation of 5.0 kw solar power plant off grid 01 nos at dehradoon public senior secondry school gopal nagar kanpur nagar
Read moreOff - grid solar photovoltaic (pv) power plant (v2)
Off - grid solar photovoltaic (pv) power plant (v2)
Read moreof your Industry type