Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constriction Of R Wall For Pedestrian Path At Bye Pass Saproon Solan Sh R Wall, Rcc Slab, Steel Etc.
|
| Description |
Constriction Of R Wall For Pedestrian Path At Bye Pass Saproon Solan Sh R Wall, Rcc Slab, Steel Etc.
|
| Organisation | Directorate of Urban Development | State Govt. and UT |
| Tender Id | 2024_UDDHP_94526_1 |
|
Reference Number |
8285-87 dt.11.10.2024 |
| Tender Fee | 4000 |
| EMD | 53260 |
| Tender Value | - |
| Place | MC Solan |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=139007 |
| Start Date | October 19, 2024 23:30 |
| End Date |
Expired
28/10/2024
Expired 719 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Auction of parking situated at saproon bye pass road ward no.2 mc solan.
Auction of parking situated at saproon bye pass road ward no.2 mc solan.
Read moreConstruction work for an rcc drain, rcc slab, and interlocking path at ward no. 08, banki police outpost
Construction work for an rcc drain, rcc slab, and interlocking path at ward no. 08, banki police outpost
Read moreRemaining work of consultancy services for preparation of dpr including land acquisition and detailed design and drawing design and drawing of road and rob (1nos) for construction of bye pass from sikar-jhunjhunu road (sh-08) to jhunjhunu chirawa ..
Remaining work of consultancy services for preparation of dpr including land acquisition and detailed design and drawing design and drawing of road and rob (1nos) for construction of bye pass from sikar-jhunjhunu road (sh-08) to jhunjhunu chirawa ..
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreC/o link road upper bhager fatoh to sarti kallari km 0/00 to 1/500 sh c/o rcc slab culvert 15.00 mtr span at rd 0/235 under dmft.
C/o link road upper bhager fatoh to sarti kallari km 0/00 to 1/500 sh c/o rcc slab culvert 15.00 mtr span at rd 0/235 under dmft.
Read moreRenovation of lis banoh in gp kharahatti tehsil arki district solan hp sh replacement of rising main providing laying and jointing rising main and hdpe pipe of various dia in distribution system and construction of rcc out let chamber 25 nos. 2nd ca
Renovation of lis banoh in gp kharahatti tehsil arki district solan hp sh replacement of rising main providing laying and jointing rising main and hdpe pipe of various dia in distribution system and construction of rcc out let chamber 25 nos. 2nd ca
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreConstruction of parking at old pickup union stand saproon bye pass solan ward no.14 mc solan.
Construction of parking at old pickup union stand saproon bye pass solan ward no.14 mc solan.
Read moreConstruction of atal path kantaliya bye pass to sheshram bhayal house towards surawas path.
Construction of atal path kantaliya bye pass to sheshram bhayal house towards surawas path.
Read moreRestoration of path damages of ambulance road from bye pass to mla qtr in ward no 10 tutikandi rd 0 00 to 0 300 (sh construction of rcc slab culvert at rd 0 140 and steel parking etc)
Restoration of path damages of ambulance road from bye pass to mla qtr in ward no 10 tutikandi rd 0 00 to 0 300 (sh construction of rcc slab culvert at rd 0 140 and steel parking etc)
Read moreof your Industry type