Tender Details

Particulars Details
Title
05/Ae/Bfsd Islampur/Bfd Ii/2023 24
Description
Upgradation/Replacement Of Phase I Fence With 358 Modular Fence Along Indo Bangladesh Border At Shq Beharampore, Krishnanagar, Malda, Raiganj And Kishanganj In The State Of West Bengal Sh Earth Work, Culvert Work, Fencing And Dismantling Of Old Fencing From Bp 327/2 R To Bp. 328/4 S (3.305 Km) From Bp. 347/1 S To Bp. 347/2 S(0.80 Km.) From Bp 385/5 S To Bp. 386/M(1.04 Km) From Bp 387/M To Bp 391/4 S(7.199 Km) And From Bp 391/4 S To 409/8 S(26.07 Km) Total Length 38.414 Km (Pkg Vii) Sw Providing Services Of One Computer Operator For The Office Work Of Assistant Engineer, Bfsd Islampur, Under Bfd Ii, Ibbz I, Cpwd, Islampur.
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 64962
Reference
Number
05/AE/BFSD-Islampur/BFD-II/2023-24
Tender Fee 0
EMD 1456
Tender Value
Place
Link https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642436343936322430352f41452f424653442d49736c616d7075722f4246442d49492f323032332d3234
Start Date January 11, 2024 19:45
End Date

18/01/2024 ( Expired 460 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
10/nit/ee/bfd-ii/2024-25

Upgradation/replacement of phase-i fence with 358 modular fence along ino bangladesh border at shq beharampore, kishnanagar, malda, raiganj and kishanganj in the state of west bengal (sh earth work, culvert work, fencing dismantling of old fencing from bp 327/2-r to bp 328/4-s (3.305 km), from bp. 347/1-s to bp 347/2-s (0.80 km), from bp 385/5-s to bp 386/m (1.04 km) from bp 387/m to bp 391/4-s (7.199 km) and from bp. 391/4-s to 409/8-s (26.07 km) total length 38.414 km (pkg-vii) (sh con of old fencing to modular fencing of 90 mtr. in between bp. no. 395/5-s to 395/6-s comes under aor of bop khunti)

Read more
Ae/bfsd-iii/cpwd/niq/2024-25/220

Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc. along indo-bangladesh border in the district of uttar dinajpur, west bengal. (package-v) in epc mode-iii. sw washing, mopping and cleaning etc. manually at bfd-ii, ibbz-i, cpwd, islampur division during 2024-25.

Read more
05/ee/bfd-ii/bfsd-iii/2024-25 (3rd call)

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sh- providing services of watch ward for the o/o the executive engineer, bfd-ii assistant engineer, bfsd-islampur, cpwd, ibbz-i, islampur.

Read more
04/ae/bfsd-iii/cpwd/2024-25

Upgradation / replacement of phase-i fence with 358 modular fence along indo-bangladesh border (ibb) at shq beharampore, krishnanagar, malda, raiganj and kishanganj in the state of west bengal. sh: earthwork, culvert work, fencing dismantling of old fencing from bp no. at 266/2-s-0.168 km. at 266/3-s - 0.303 km, 266/4-s to 267/6-s - 1.723 km, 270/3-s to 270/4-s - 0.38 km, 277/38-s to 277/43-s - 0.253 km, 278/38-s to 279/9-s - 1.487 km, 291/27-s to 291/29-s - 0.20 km, 297/3-s to 297/8-s - 1.995 km, 300/mp to 304/3-s - 10.977 km, total length - 17.486 km. (pkg-v) sh: installation of one number modular fencing gate near bp no. 279/mp in between bfl pole 13-14 in aor of bop mathurapur, 137 bn., bsf.

Read more
05/ee/bfd-ii/bfsd-iii/2024-25(2nd call)

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) . sh-in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo-bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sh- proving services of watch ward for the o/o the executive engineer, bfd-ii assistant engineer, bfsd islampur, cpwd,( ibbz-i) islampur.

Read more
06/ee/bfd-ii/bfsd-iii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km). sh -in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bop, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo-bangladesh border in the district of uttar dinajpur, west bengal(package-v) in epc mode-iii. sw-providing services of one sel driven inspection vehicle for office duty of the assistant engineer, bfsd-islampur, ibbz-i, cpwd, islampur under bfd-ii, islampur, uttar dinajpur.

Read more
05/ee/bfd-ii/bfsd-iii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km).sh- in various stretches from bp. no. 355/2-s to 357/1-s (4.725km), 361/m to 365/m (6.329km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s(0.180 km) and 409/5-s to 417/8-s (15.383km) (total length 27.447km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo-bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sh-providing services of watch ward for the o/o the executive engineer, bfd-ii assistant engineer, bfsd islampur, cpwd, ibbz-i, islampur

Read more
03/ee/bfd-ii/bfsd-ii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh- in various stretches from bp. no. 355/2-s to 357/1-s(4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo-bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sw- providing services of one sel driven inspection vehicle for office duty of executive engineer, bfd-ii, ibbz-i, cpwd, islampur, uttar dinajpur.

Read more
02/ee/bfd-ii/bfsd-ii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km). sh in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km) including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo-bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sw -providing services of one sel driven inspection vehicle for office duty of the assistant engineer, bfsd-raiganj, ibbz-i, cpwd, raiganj under bfd-ii, islampur, uttar dinajpur.

Read more
04/ae/bfsd-i/bfd-ii/cpwd/2024-25

Ordinary repair, flood damage repair and bridge repair of ibb road at various stretches from bp no. 327/2r to 362/mp of border fencing sub-division, kaliyaganj, under bfd-ii, ibbz-i, during the block year 2024-25. (sh: flood repair work at temporary di of ibbr 42 form culvert at di in the aor of bop kakarmani, bsf,shq kishanganj).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise