Tender Details
Particulars | Details |
---|---|
Title |
Marine Type Search Light Fitting Suitable For 150 Watt Halogen Lamps To Work On 24 V Dc
|
Description |
|
Organisation | NA | Ministry of Ports, Shipping and Waterways |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 24, 2025 00:38 |
End Date |
15/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreWidening, reconstruction and up-gradation to 2pls configuration for the work of bhimashankar-taleghar- wada- rajgurunagar the state of maharashtra on ham.
Widening,reconstruction and up-gradation to 2pls configuration for the work of bhimashankar-taleghar-wada-rajgurunagar the state of maharashtra on ham.
Read moreConsultancy work for preparing social impact assessment and social impact management report, environmental impact study and mitigation report (on all points related to environment) for acquiring land of some gatas of 04 villages bhupiyamau, badanpur,
Consultancy work for preparing social impact assessment and social impact management report, environmental impact study and mitigation report (on all points related to environment) for acquiring land of some gatas of 04 villages bhupiyamau, badanpur,
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type