Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Under Janakipuram Third Ward, Improvement Work Of Road, Drain, Etc. Has Been Carried Out By A Paver Finisher Along The Boundary Wall Of Aktu, With Interlocking Ramp On The Footpath Beside Gate Number 3, Interlocking On The Footpath Towards Gate Etc
|
| Description |
Under Janakipuram Third Ward, Improvement Work Of Road, Drain, Etc. Has Been Carried Out By A Paver Finisher Along The Boundary Wall Of Aktu, With Interlocking Ramp On The Footpath Beside Gate Number 3, Interlocking On The Footpath Towards Gate Etc
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2025_DOLBU_1068928_1 |
|
Reference Number |
97/CE/2025-26/11 |
| Tender Fee | 6509 |
| EMD | 4.76 Lakh |
| Tender Value | |
| Place | Lucknow Municipal Corporation |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1950191 |
| Start Date | August 27, 2025 18:00 |
| End Date |
Expired
10/09/2025
Expired 291 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road improvement, drain repair, and footpath interlocking along with other works from m0 san 5/359 in sector-5 of janakipuram third ward to brink point via power grid township using a paver finisher.
Road improvement, drain repair, and footpath interlocking along with other works from m0 san 5/359 in sector-5 of janakipuram third ward to brink point via power grid township using a paver finisher.
Read moreConstruction of side patri by interlocking tiles on the footpath along the right side of jarcha road towards the bypass, from gurjar colony gate no. 01 up to saraswati vidya mandir.
Construction of side patri by interlocking tiles on the footpath along the right side of jarcha road towards the bypass, from gurjar colony gate no. 01 up to saraswati vidya mandir.
Read moreHariparvat zone, room no. 28, kaveripuram colony, drain repair from house number 13 to the gate and improvement work by interlocking tiles on the side track.
Hariparvat zone, room no. 28, kaveripuram colony, drain repair from house number 13 to the gate and improvement work by interlocking tiles on the side track.
Read moreZone-2 work of making boundary wall, culvert and ramp on the drain by rcc of room no. 45, swami haridas garden.
Zone-2 work of making boundary wall, culvert and ramp on the drain by rcc of room no. 45, swami haridas garden.
Read moreJanakipuram third ward, the road (by the paver finisher) from sector-9 includes maintenance of drains and side track interlocking and other works from m.s. 9/71 to m.s. 9/81, from m.s. 9/53 to m.s. 9/58, from m.s. 9/46 to m.s. 9/30, from m.s. 9/43etc
Janakipuram third ward, the road (by the paver finisher) from sector-9 includes maintenance of drains and side track interlocking and other works from m.s. 9/71 to m.s. 9/81, from m.s. 9/53 to m.s. 9/58, from m.s. 9/46 to m.s. 9/30, from m.s. 9/43etc
Read moreImprovement work of footpath by interlocking near the drain and government children home near the nsi boundary in kheda village in ward-17 under zone-6.
Improvement work of footpath by interlocking near the drain and government children home near the nsi boundary in kheda village in ward-17 under zone-6.
Read moreComprehensive maintenance of entire nsm area azadpur raising gt of storm water drain ic filling of depressions area of a-b road, dismantling and re-construction of boundary wall improvement of footpath along boundary wall towards railway l
Comprehensive maintenance of entire nsm area azadpur raising gt of storm water drain ic filling of depressions area of a-b road, dismantling and re-construction of boundary wall improvement of footpath along boundary wall towards railway l
Read moreAzadpur i.e. raising g.t. of storm water drain ic filling of depressions area of a b road dismantling and re construction of boundary wall improvement of footpath along boundary wall towards railway land
Comprehensive maintenance of entire nsm area azadpur i.e. raising g.t. of storm water drain ic filling of depressions area of a b road dismantling and re-construction of boundary wall improvement of footpath along boundary wall towards railway land
Read moreDrain repair work on the side track by interlocking tiles and hotmix from house number b-41 in hariparvat zone room number-84 natraj puram till the gate via mr. sobhit sharma house.
Drain repair work on the side track by interlocking tiles and hotmix from house number b-41 in hariparvat zone room number-84 natraj puram till the gate via mr. sobhit sharma house.
Read moreUnder vidyavati third ward, sector-l rail vihar colony, m. no. 4a/01 to 4a/09 and improvement work by paving the road on the drain side track towards the park.
Under vidyavati third ward, sector-l rail vihar colony, m. no. 4a/01 to 4a/09 and improvement work by paving the road on the drain side track towards the park.
Read moreof your Industry type