Tender Details

Particulars Details
Title
In Ward 62 Govindapuram, Ddps Has Been Transferred From H Block Cut. Patch Repair Work Up To Gate No 03.
Description
In Ward 62 Govindapuram, Ddps Has Been Transferred From H Block Cut. Patch Repair Work Up To Gate No 03.
Organisation Government of Uttar Pradesh
Tender Id 2023_DOLBU_832355_95
Reference
Number
08/Nirman/2023-24 Dt. 25.08.2023
Tender Fee 1357
EMD 29839
Tender Value -
Place ghaziabad nagar nigam
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date August 28, 2023 18:30
End Date
Expired 02/09/2023

Expired 1101 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
In ward-62 govindapuram, ddps has been transferred from h-block cut. patch repair work up to gate no-03.

In ward-62 govindapuram, ddps has been transferred from h-block cut. patch repair work up to gate no-03.

Read more
Ward-29 defence colony has been closed on kati road and dlf road. repair work by patch of the main damaged road.

Ward-29 defence colony has been closed on kati road and dlf road. repair work by patch of the main damaged road.

Read more
Ward-29 defence colony has been closed on kati road and dlf road. repair work by patch of the main damaged road.

Ward-29 defence colony has been closed on kati road and dlf road. repair work by patch of the main damaged road.

Read more
In the sector-03 plan of the trust, 100 feet road has been constructed with dividers, interlocking tiles rcc and other roads. road asphalting work by culvert and paver finisher.

In the sector-03 plan of the trust, 100 feet road has been constructed with dividers, interlocking tiles rcc and other roads. road asphalting work by culvert and paver finisher.

Read more
Under janakipuram third ward, improvement work of road, drain, etc. has been carried out by a paver finisher along the boundary wall of aktu, with interlocking ramp on the footpath beside gate number 3, interlocking on the footpath towards gate etc

Under janakipuram third ward, improvement work of road, drain, etc. has been carried out by a paver finisher along the boundary wall of aktu, with interlocking ramp on the footpath beside gate number 3, interlocking on the footpath towards gate etc

Read more
Under vijayanagar zone, the damaged road from dr. pal to rashipal house in ward 03, sector-09 old vijay nagar and in the supporting lanes has been damaged. the work of improving the road.

Under vijayanagar zone, the damaged road from dr. pal to rashipal house in ward 03, sector-09 old vijay nagar and in the supporting lanes has been damaged. the work of improving the road.

Read more
Under vijayanagar zone, the damaged road from dr. pal to rashipal house in ward 03, sector-09 old vijay nagar and in the supporting lanes has been damaged. the work of improving the road.

Under vijayanagar zone, the damaged road from dr. pal to rashipal house in ward 03, sector-09 old vijay nagar and in the supporting lanes has been damaged. the work of improving the road.

Read more
Estimate for as per the sanction estimate under sstd scheme of khetakheda substation capacity 3.15 mva ptr the estimate has been framed accordingly. reff. latter no. md/wz/08/03-3998 dt. 17-03-2025 and md/wz/08/03-16788 dt. 20-11-2025. under harkiyak

Estimate for as per the sanction estimate under sstd scheme of khetakheda substation capacity 3.15 mva ptr the estimate has been framed accordingly. reff. latter no. md/wz/08/03-3998 dt. 17-03-2025 and md/wz/08/03-16788 dt. 20-11-2025. under harkiyak

Read more
Cutting old and used iron materials from near ns workshop lodna for making new shed for manpower staying and one number of er which has been installed near bararee d patch of amal.joyrampur colliery under lodna area

Cutting old and used iron materials from near ns workshop lodna for making new shed for manpower staying and one number of er which has been installed near bararee d patch of amal.joyrampur colliery under lodna area

Read more
Electrification of pvtg habitation and house hold under pvtg scheme by ministry of power govt. of india at village sardarpur pvtg habitation- adiwasi basti no. of house hold 03 no. this survey has been done by mr. maheswer sir je.

Electrification of pvtg habitation and house hold under pvtg scheme by ministry of power govt. of india at village sardarpur pvtg habitation- adiwasi basti no. of house hold 03 no. this survey has been done by mr. maheswer sir je.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise