Tender Details

Particulars Details
Title
Kota Division: Replacement Of Defective Signaling Cables For Enhancing Safety Of Signaling System.: Signaling Work In Connection With Track Renewal Works In Kota Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78263682
Reference
Number
KOTA-SNT-SIG-2024-13-14-M
Tender Fee 0
EMD 3.21 Lakh
Tender Value -
Place Jabalpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78263682/viewNitPdf_4762339.pdf

Start Date November 12, 2024 19:07
End Date
Expired 09/12/2024

Expired 619 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 300 mm dia 122 m deep hytw with connection to main pipe line for booster boring & construction of pump room in nalanda mahila college in ward no-36 situated in bihar sharif municipal corporation.

Construction of 300 mm dia 122 m deep hytw with connection to main pipe line for booster boring & construction of pump room in nalanda mahila college in ward no-36 situated in bihar sharif municipal corporation.

Read more
M/o completed schemes under na-ii hort. zone.(annual repair and maintenance of various civil works in parks under the jurisdiction of sub division-i/hcd- 1/dda/hort, for financial year 2026-27.)

M/o completed schemes under na-ii hort. zone.(annual repair and maintenance of various civil works in parks under the jurisdiction of sub division-i/hcd- 1/dda/hort, for financial year 2026-27.)

Read more
M/o completed schemes under nazul a/c-ii/hz.(annual repair and maintenance of various civil works in parks under the jurisdiction of sub division-iv/hcd- 1/dda/hort, for financial year 2026-27.)

M/o completed schemes under nazul a/c-ii/hz.(annual repair and maintenance of various civil works in parks under the jurisdiction of sub division-iv/hcd- 1/dda/hort, for financial year 2026-27.)

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Turnkey contract for installation of 18 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, chapra and samastipur under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Turnkey contract for installation of 18 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, chapra and samastipur under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Read more
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Read more
Design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischayyojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/ etc.) certified by csir or any other institute of national repute. in the district of .bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive

Design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under “har ghar nal ka jal” nischayyojna in areas having ground water quality issues; with electric driven pumps and arsenic removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/ etc.) certified by csir or any other institute of national repute. in the district of .bhojpur, bihar on turn-key basis with 6 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected) under p.h. division, ara, block- ara panchayat- mahuli (ward no-10 ) gr-02

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise