Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
(1) Extention Of Tunnel 18 A By Constructing 100 Meter Length Cut &Amp Cover At Portal 1 End Between Ch. 76/964 Km To 77/064 Km In Khongsang Awangkhul Section. (2) Extention Of Tunnel T 23 A (Cut &Amp Cover Of Length=240.40m) At Portal 1 End Between Ch. 84/740 Km To 84/980.4 Km In Awangkhul Noney Section And (3) Balance Work Of Tunnel 25 From Km 89.678 To Km 91.056 (Misalignment Rectification And Collapsed Portion) And Tunnel 26 From Km 91.151 To Km 92.557 (Collapsed Portion) Including Portal
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83866498 |
|
Reference Number |
CE-CON-JI-TN-2025-11 |
| Tender Fee | 0 |
| EMD | 86.81 Lakh |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83866498/viewNitPdf_5087054.pdf |
| Start Date | August 23, 2025 00:57 |
| End Date |
Expired
26/09/2025
Expired 386 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation, testing and commissioning of integrated tunnel communication systems, ofc based industrial grade network system including laying of ofc & other cables for railway network which includes tunnels and stations in awangkhul-noney section of jiribam - imphal new railway line project.
Supply, installation, testing and commissioning of integrated tunnel communication systems, ofc based industrial grade network system including laying of ofc & other cables for railway network which includes tunnels and stations in awangkhul-noney section of jiribam - imphal new railway line project.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreEngineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Read moreJeypore- malkangiri new b.g railway line : geotechnical investigation, geological mapping and desk study of the tunnel alignment etc. between tanginiguda station to govindapalli station i.e., tunnel-1 from ch. 41592m to 42052m, tunnel-2 from ch.42870m to 43620m, tunnel-3 from ch.44181m to 44771m, tunnel-4 from ch.45460m to 45560m, tunnel-5 from ch.50177m to 53177m, tunnel-6 from ch.57503m to 59253m, tunnel-7 from ch.60778m to 61308m, tunnel-8 from ch.61529m to 61709m, tunnel-9 from ch.61919
For complete deion and other details, please refer to tender
Read moreSelection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between
Selection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between thane to borivali
Read more(1) construction of new tunnel-28 containing two line crossing tupul station in between tunnel-26b and tunnel-1and design of broad gauge ballastless track including proof checking, supply, installation, testing and commissioning all necessary structures for operation purposes, in noney-imphal section (2) design, supply, erection & commissioning of tunnel ventilation, electrical and mechanical system electrification and 33kv/11kv sub-station at new tunnel in between tupul-imphal (3.87 km) i
For complete deion and other details, please refer to tender
Read moreConstruction of box tunnel on pile foundation with touch piles on both sides between ch 39457 - 39492 and box tunnel (open foundation between ch 39492 - 39620 as slop protection measure in connection with dimapur(dhansari)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreRestoration of road cut made by cmwssb at east avenue (ch 0-450m) in div 84, zone 07.
Restoration of road cut made by cmwssb at east avenue (ch 0-450m) in div 84, zone 07.
Read moreConstruction of cast-in-situ box tunnel in rock falling location in between ch. 7.660 km to ch. 7.890 km from hansdiha and making suitable di line in connection with new bg line between hansdiha and godda.
For complete deion and other details, please refer to tender
Read moreDetailed design, 3d monitoring, geotechnical investigation and construction supervision of construction of single line bg tunnel no.1 between ch: 7540 to ch: 11640, (approximate total length 4100 m) including escape tunnel (approximate total length 4100 m) between badiya (ch: 4100 m) - beka (ch: 14750 m) stations of dr. ambedkar nagar (mhow) - sanawad section in connection with ratlam-mhow-khandwa gauge con project of western railway
For complete deion and other details, please refer to tender
Read moreof your Industry type