Tender Details
Particulars | Details |
---|---|
Title |
Supply, Installation And Configuration Of Cctv Camera And Networking System At Sulphur Godown Of Sa Plant And Supply, Digging And Laying Of Ofc From Phase Ii Weigh Bridge Area To The End Of Road Cutting Near Cisf Room, Phase Ii At Fact Cd.
|
Description |
Supply, Installation And Configuration Of Cctv Camera And Networking System At Sulphur Godown Of Sa Plant And Supply, Digging And Laying Of Ofc From Phase Ii Weigh Bridge Area To The End Of Road Cutting Near Cisf Room, Phase Ii At Fact Cd.
|
Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
Tender Id | 2025_FACT_842788_1 |
Reference Number |
04028/2024-2025/E30698 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | AMBALAMEDU |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=885898 |
Start Date | January 04, 2025 19:30 |
End Date |
20/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of milk tanker reception , irs building, road and storm water drainage, compound wall,bore-3 nos, rest room and electrical provisions for the achrapakkam dairy plant 1llpd capacity at achrpakkam phase-ii.
Construction of milk tanker reception , irs building, road and storm water drainage, compound wall,bore-3 nos, rest room and electrical provisions for the achrapakkam dairy plant 1llpd capacity at achrpakkam phase-ii.
Read moreInternal, external electrification works for structural plant, compound, office room, weigh bridge room, security room, pump panel and supply installation of pump motor for proposed 200 tpd municipal fresh waste processing plant under swm project
Internal, external electrification works for structural plant, compound, office room, weigh bridge room, security room, pump panel and supply installation of pump motor for proposed 200 tpd municipal fresh waste processing plant under swm project
Read moreA r and m o water supply under sub-division-ii, cd, apwd, diglipur during 2025-26. sw- laying of pumping line for newly installed 72 hp pump from machi culvert pump house to swarajgram treatment plant
A r and m o water supply under sub-division-ii, cd, apwd, diglipur during 2025-26. sw- laying of pumping line for newly installed 72 hp pump from machi culvert pump house to swarajgram treatment plant
Read moreI and cadd jcr dlis phase ii 4l distributory system fabrication supply and erection of em parts gates hoist and hoist bridge of 4l ot sluice at km 12.625 of rfmc
I and cadd jcr dlis phase ii 4l distributory system fabrication supply and erection of em parts gates hoist and hoist bridge of 4l ot sluice at km 12.625 of rfmc
Read moreDrilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-65 phase -ii, circle-11, rajendr nagar, charminar zone, ubd, ghmc for the year 2025-26
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at :- janachaitanya park-65 phase-ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26
Read moreDrilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submercible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-78 phase -ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submercible pump with accessories and laying and jointing of hdpe pipe line work at : janachaitanya park-78, phase -ii, circle-11, rajendranagar, charminar zone, ubd, ghmc for the year 2025-26
Read moreGodavari drinking water supply scheme phase-ii iii - filling of osmansagar himayatsagar reservoirs with godavari water for rejuvenation of musi river
Ncb for gdwss ph ii and iii filling of os and hs reservoirs with godavari water for rejuvenation of musi river-manufacture, supply, lowering, laying, jointing, testing and commissioning of 2200mm ms pmain from ghanpur to osmansagar, 2400mm ms pmain from ghanpur to muthangi, 3000mm dia ms pipeline from kokapet to osmansagar conduit along orr and 2200mm dia ms pipeline for interconnection of osmansagar and himayathsagar reservoirs, 3000mm dia ms pmain from wtp to mbr at ghanpur, construction of 80 ml mbr, 18ml rwr and ph and eme, transfr, substn at ghanpur and 1500mm dia ms main, construction of 120 mld wtp, 18ml cwr, ph with eme, substn, 1200mm dia ms cwpmain at osmansagar, 22.50ml mbr at golden mile and 800/600/400mm dia distn mains from mbr under os and 1200mm dia ms main, construction of 70 mld wtp, 18ml cwr, ph with eme, substn at hs, 1000mm dia ms pmain to budvel reservoir under hs reservoir under hybrid annuity mode of contract-including mom of project for 10 years package ii
Read moreGodavari drinking water supply scheme phase-ii iii - filling of osmansagar himayatsagar reservoirs with godavari water for rejuvenation of musi river
National competitive bidding ncb for godavari drinking water supply project phase-ii and phase-iii and filling of osmansagar and himayathsagar reservoirs for rejuvenation of musi river under hybrid annuity mode of contract manufacture, supply, lowering, laying, jointing, testing and commissioning of 3000mm dia ms pumping main in two rows 10 tmc each from mallannasagar to ghanpur, construction of pump house, electro mechanical equipment, transformers, substation at mallannasagar and construction of 1170 mld capacity wtp, 40 ml clear water reservoir cum pump house, electro mechanical equipment, transformers, at ghanpur under hybrid annuity mode of contract including manning, operation and maintenance of project for 10 years package-i
Read moreJal jeevan mission (jjm) works-phase ii-cwss to oachira, clappana, alappad panchayath and karunagappally municipality -supply of 930 kg capacity new empty chlorine gas toner with valve and guard at water treatment plant, oachira
Jal jeevan mission&#x0d (jjm) works-phase ii-cwss to oachira,&#x0d clappana, alappad panchayath and&#x0d karunagappally municipality -supply of 930&#x0d kg capacity new empty chlorine gas toner&#x0d with valve and guard at water treatment plant,&#x0d oachira
Read moreComplete repairing / reconditioning of 3.3 kv ocb switch, 400 amp, make-bharat bijlee, s/n-sgw-2 installed at ht room for proper power supply to oversize restriction plant and ii) 3.3 kv ocb switch make-kirloskar, s/n-401001-34 installed at main sub-
Complete repairing / reconditioning of 3.3 kv ocb switch, 400 amp, make-bharat bijlee, s/n-sgw-2 installed at ht room for proper power supply to oversize restriction plant and ii) 3.3 kv ocb switch make-kirloskar, s/n-401001-34 installed at main sub-
Read moreof your Industry type