Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply And Installation Of 07 Nos. 3 Phase, 4 Wire, 110 V, 5 A Energymeter (Trivector Meter) For Energy Monitoring At Different Points Under Govindpur Area Iii
|
Description |
Supply And Installation Of 07 Nos. 3 Phase, 4 Wire, 110 V, 5 A Energymeter (Trivector Meter) For Energy Monitoring At Different Points Under Govindpur Area Iii
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1823 |
Tender Value | |
Place | Govindpur Area Office |
Link |
AAAAAAAAAA Login to view |
Start Date | June 16, 2025 16:30 |
End Date |
24/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreTerm contract for artificer work in various billets, all messes (offrs mess, snco mess and airmen mess) and em installation, otm buildings under age br-i of ge (af) adm area at af station agra.
Term contract for artificer work in various billets, all messes (offrs mess, snco mess and airmen mess) and em installation, otm buildings under age br-i of ge (af) adm area at af station agra.
Read moreSupply of day-old commercial broiler chicks and hatching eggs at different units under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake city kolkata -700106 for the year 2025-2026.
Supply of day-old commercial broiler chicks and hatching eggs at different units under west bengal livestock development corporation limited, lb-2, sector-iii, salt lake city kolkata -700106 for the year 2025-2026.
Read more81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
Read moreSupply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&#x0d
Read moreRepair/maint to water supply installation pumps/motors with allied services and cleaning of oh tanks/ug sumps at basistha area under ge guwahati
Repair/maint to water supply installation pumps/motors with allied services and cleaning of oh tanks/ug sumps at basistha area under ge guwahati
Read moreSupply fabrication erection testing and commissioning of 07nos sluice cum fb gate and hoist at rd 6550mtr on right branch of kochiakoili nallah at kharasahapur bahanaga balasore under drainage division balasore for the year 2025 26
Supply fabrication erection testing and commissioning of 07nos sluice cum fb gate and hoist at rd 6550mtr on right branch of kochiakoili nallah at kharasahapur bahanaga balasore under drainage division balasore for the year 2025 26
Read moreof your Industry type