Tender Details

Particulars Details
Title
Layout, Design, Drawing And Const Of Permt Establishment, Adm Block, Other Married Accom And Married Accom Allied Units Including Internal, External Services, Arboriculture And Furniture For Hq Ce(p) Ank At Hollongi, Of A. P Under 119 Rcc/756 Brtf
Description
Layout, Design, Drawing And Const Of Permt Establishment, Adm Block, Other Married Accom And Married Accom Allied Units Including Internal, External Services, Arboriculture And Furniture For Hq Ce(p) Ank At Hollongi, Of A. P Under 119 Rcc/756 Brtf
Organisation Defence eProcurement Portal
Tender Id 2023_BRO_608004_1
Reference
Number
ANK/NIT-04 /2023-24
Tender Fee 10000
EMD 66.25 Lakh
Tender Value -
Place Chief Engineer (P) Arunank
Link
View Original Tender Notice

https://defproc.gov.in

Start Date August 05, 2023 22:45
End Date
Expired 21/08/2023

Expired 1150 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh

Engaging technical consult for prep of fs (dpr) on epc mode for const of rd huri-taksing (new alignment) from km 0.000 to km 95.348 from green field to nhdl specifications in 85 rcc/756 brtf under project ank in the state of arunachal pradesh

Read more
Epc mode for layout, design, drawing and construction of permanent establishment, adm block, other than married accommodation and married accommodation, allied units including internal, external services and arboriculture for hq ce(p) brahmank at p

Epc mode for layout, design, drawing and construction of permanent establishment, adm block, other than married accommodation and married accommodation, allied units including internal, external services and arboriculture for hq ce(p) brahmank at p

Read more
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf

Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf

Read more
Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap

Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap

Read more
Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Read more
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Read more
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc

Read more
Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a.p

Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a.p

Read more
Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a. p

Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a. p

Read more
Re tender for supply and stacking of crushed sand well graded compacted earth sand gravel size not exceeding 75 mm at km 2.000 for cut and cover tunnel on hapoli sarli huri huri axis road under 119 rcc 756 brtf of project arunank

Re tender for supply and stacking of crushed sand well graded compacted earth sand gravel size not exceeding 75 mm at km 2.000 for cut and cover tunnel on hapoli sarli huri huri axis road under 119 rcc 756 brtf of project arunank

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise