Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Exec Of Protective Works For Slope Protection Measures Along Identified Land Slide On Km 164, Km 181 (Sarli Axis) On J K S Rd Geological, Preparation Of Design 119 Rcc/756 Tf Under P Ank In Kurung Kumey Dist Of A. P Through Epc
|
| Description |
Exec Of Protective Works For Slope Protection Measures Along Identified Land Slide On Km 164, Km 181 (Sarli Axis) On J K S Rd Geological, Preparation Of Design 119 Rcc/756 Tf Under P Ank In Kurung Kumey Dist Of A. P Through Epc
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_BRO_613662_1 |
|
Reference Number |
ANK/NIT-13/2023-24 (EPC) |
| Tender Fee | 10000 |
| EMD | 31.55 Lakh |
| Tender Value | - |
| Place | HQ CE (P) Arunank (GREF) |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | September 08, 2023 22:40 |
| End Date |
Expired
18/09/2023
Expired 1123 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Exec of protective works for slope protection measures along identified land slide on km 164, km 181 (sarli axis) on j-k-s rd geological, preparation of design 119 rcc/756 tf under p ank in kurung kumey dist of a. p through epc
Read moreExecution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Read moreDevelopment of new a site retail outlet location- within sarli block limits, not on nh/sh, kurung kumey district, arunachal pradesh under tinsukia do
Development of new a site retail outlet location- within sarli block limits, not on nh/sh, kurung kumey district, arunachal pradesh under tinsukia do
Read moreExec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p
Exec of slope stabilization works and river training wks at km 1.00 on road tcc-maza and km 6.900, km 33.820,km 35.800 on d-t rd including geological investigation, prep of design and its proof check from iit under 23 tf/ p ank in upper subansiri a.p
Read moreExecution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode
Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode
Read moreExecution of protective works for slope protection and retention loc for rd safety at km 42.800 (both hill and valley side) and km 54.000(valley side) (huri axis) on lee- huri rd including geological investigation, 85 rcc/756tf p ank on epc mode
Execution of protective works for slope protection and retention loc for rd safety at km 42.800 (both hill and valley side) and km 54.000(valley side) (huri axis) on lee- huri rd including geological investigation, 85 rcc/756tf p ank on epc mode
Read moreEngaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a.p
Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a.p
Read moreEngaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a. p
Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd semai-baskar-kawachi (new alignment) km 54.873 to km 90.00 (net length 35.127) green field alignment to nhsl specifications in the aor of 119 rcc under 756 tf p ank in a. p
Read moreEngaging technical consult for prep of (fs) (dpr) on epc mode for const rd phulle-wasi-dharmu-sangia (new alignment) from km 13.500 to km 40.00 (net 26.50 km) green field alignment to nhsl specifications the aor of 85 rcc under 756 tf p ank in a.p
Engaging technical consult for prep of (fs) (dpr) on epc mode for const rd phulle-wasi-dharmu-sangia (new alignment) from km 13.500 to km 40.00 (net 26.50 km) green field alignment to nhsl specifications the aor of 85 rcc under 756 tf p ank in a.p
Read moreEngaging technical consultant for preparation of (fs) and (dpr) on epc mode for const rd tapa-hush-dille gg (new alignt) km 0.00 to 58.00 (net length 58.00 km) green field alignt to nhsl specifications in the aor of 85 rcc under 756 tf p ank in a.p
Engaging technical consultant for preparation of (fs) and (dpr) on epc mode for const rd tapa-hush-dille gg (new alignt) km 0.00 to 58.00 (net length 58.00 km) green field alignt to nhsl specifications in the aor of 85 rcc under 756 tf p ank in a.p
Read moreof your Industry type