Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚇 Invitation For Epc Contract: New Bg Line Construction 🛠️ The Ministry Of Railways, Central Government, Invites Tenders For The Engineering, Procurement, And Construction (Epc) Contract For The Construction Of A New Broad Gauge (Bg) Line Section. The Project Spans 10.70 Km From Km. 106.800 To Km. 120.300, Excluding A 2.80 Km Stretch Between Km. 111.650 To Km. 114.450, Between Sircilla And Vemulawada Stations In The State Of Telangana. 📅 Bid Submission Deadline: June 24, 2024, 3:00 Pm A Tender Security Amounting To Inr 14,81,900/ Is Required. Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents. Keywords: Epc Contract, Construction, Railway, Bg Line, Sircilla, Vemulawada, Telangana, Ministry Of Railways, Government Tender, Tender Security| Particulars | Details |
|---|---|
| Title |
Scr Construction Organization: Engineering Procurement Construction (Epc) Contract In Connection With Construction Of New Bg Line Section For 10.70 Km From Km. 106.800 To Km. 120.300 [Excluding 2.80 Km Stretch Between Km. 111.650 To Km. 114.450] Between Sircilla (Incl.) &Amp Vemulawada (Incl.) Stations In Connection With Manoharabad Kothapalli New Bg Line Project In The State Of Telangana .
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74078218 |
|
Reference Number |
EPC-06-CAO-C-SC-2024 |
| Tender Fee | 0 |
| EMD | 1.48 Crore |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/74078218/viewNitPdf_4506958.pdf |
| Start Date | March 14, 2024 00:26 |
| End Date |
Expired
24/06/2024
Expired 843 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
South central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
South central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
Read moreSouth coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
South coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
Read moreRequest for proposal for the construction of new bg 4th line from chainage 39.998 km to chainage 61.494 km between guduvancheri (incl.) & chengalpattu (incl.) stations (package-ii) for civil engineering, signalling & tele communication, electrical general and 2x25 kv ohe electrification works, including utility shifting between tambaram and chengalpattu
Request for proposal for the construction of new bg 4th line from chainage 39.998 km to chainage 61.494 km between guduvancheri (incl.) & chengalpattu (incl.) stations (package-ii) for civil engineering, signalling & tele communication, electrical general and 2x25 kv ohe electrification works, including utility shifting between tambaram and chengalpattu
Read moreConstruction of staff quarters, rest house, other structures in connection with new bg line between deshalpar - hajipir - luna and vayor - lakhpat under ahmedabad division on western railway.
Construction of staff quarters, rest house, other structures in connection with new bg line between deshalpar - hajipir - luna and vayor - lakhpat under ahmedabad division on western railway.
Read moreProviding and fixing friction / friction cum hydraulic buffer stops at dead ends between chainage 6+015 (fls) to 125+200 (fls) in connection with new bg line between rishikesh and karanprayag (125km) in the state of uttarakhand, india.
Providing and fixing friction / friction cum hydraulic buffer stops at dead ends between chainage 6+015 (fls) to 125+200 (fls) in connection with new bg line between rishikesh and karanprayag (125km) in the state of uttarakhand, india.
Read moreSlope protection work and other ancillary work etc. at piphema yard in between ch 59.400 km to ch 60.700 km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
Slope protection work and other ancillary work etc. at piphema yard in between ch 59.400 km to ch 60.700 km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
Read moreEarthwork, construction of balanced major and minor bridges and protection works, trolley refuge, diversion of road in rub between chainage 117404m to 124830m in connection with construction of jiribum-tupul-imphal new bg railway line project.
Earthwork, construction of balanced major and minor bridges and protection works, trolley refuge, diversion of road in rub between chainage 117404m to 124830m in connection with construction of jiribum-tupul-imphal new bg railway line project.
Read moreDesign, engineering, supply, installation, testing and commissioningof 03 nos. integrated traction substations at yog nagri rishikesh,srinagar and karanprayag in connection with railway electrificationof new bg rail line between rishikesh and karnprayag in the state ofuttarakhand.
Design, engineering, supply, installation, testing and commissioningof 03 nos. integrated traction substations at yog nagri rishikesh,srinagar and karanprayag in connection with railway electrificationof new bg rail line between rishikesh and karnprayag in the state ofuttarakhand.
Read moreConducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Read moreExecution of balance works i.e. drain & toe wall, protection works of cutting area and other miscellaneous civil engineering works between ghatoli station to biaora station, in the state of rajasthan & madhya pradesh, in connection with the ramganjmandi-bhopal new bg rail line project of kota division, west central railway
Execution of balance works i.e. drain & toe wall, protection works of cutting area and other miscellaneous civil engineering works between ghatoli station to biaora station, in the state of rajasthan & madhya pradesh, in connection with the ramganjmandi-bhopal new bg rail line project of kota division, west central railway
Read moreof your Industry type