Tender Details

Particulars Details
Title
Composite Work For Earthwork In Bank Including Blanketing Material (For Except Major Bridge Locations), Construction Of Minor Bridges Including Ru Bs, Supply Of Ballast, Laying And Linking Of New Bg Rail Line (Including Balupur Yard), Transportation Of Sleepers &Amp Other P Way Material &Amp Misc. Works Between Km 110.00 Km 115.00 Of Panna Khajuraho Section Of Lalitpur Singrauli New Bg Rail Line Project.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 76775709
Reference
Number
DY-CE-C-KURJ-04-2024
Tender Fee 0
EMD 25.65 Lakh
Tender Value -
Place Jabalpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76775709/viewNitPdf_4676786.pdf

Start Date August 26, 2024 20:06
End Date
Expired 18/09/2024

Expired 758 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar

Engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar

Read more
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Read more
Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project

Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise