Utility Shifting Of Electric Work At 02 Lane Rob On Jafrabad Jaunpur Section At Km 826/3 4 Level Xing No4 Spl In District Jaunpur (10.5 M Carriage Way)
|
Description |
Utility Shifting Of Electric Work At 02 Lane Rob On Jafrabad Jaunpur Section At Km 826/3 4 Level Xing No &Amp#X0d
4 Spl In District Jaunpur (10.5 M Carriage Way) &Amp#X0d
|
Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
Tender Id | 2024_UPSBC_955523_2 |
Reference Number |
1589/E-TENDER/GM(VNS)/24, DT-11/09/2024 |
Tender Fee | 11800 |
EMD | 7.1 Lakh |
Tender Value | |
Place | JAFRABAD JAUNUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1696477 |
Start Date | October 30, 2024 15:30 |
End Date |
11/11/2024 ( Expired 161 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of service road both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Construction of service road both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Read moreProviding and laying prime coat, tack coat, dbm b.c. etc. work in approach and service road of 2 lane r.o.b. in lieu x-ing no.-60a at km (muradipur-bindki road) of north central railway on pry-cnb section in district fatehpur
Providing and laying prime coat, tack coat, dbm b.c. etc. work in approach and service road of 2 lane r.o.b. in lieu x-ing no.-60a at km (muradipur-bindki road) of north central railway on pry-cnb section in district fatehpur
Read moreEngagement of user fee collection agency on the basis of cb through etender for engagement of user fee agency through etender at bela fp in satna district at km 199.250 for the use of 4 and more lane sec f satna-bela section of nh75 in madhya pradesh
Engagement of user fee collection agency on the basis of cb through etender for engagement of user fee agency through etender at bela fp in satna district at km 199.250 for the use of 4 and more lane sec f satna-bela section of nh75 in madhya pradesh
Read moreConstruction of re wall both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Construction of re wall both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Read moreConstruction of service road both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Construction of service road both side on 02 lane rob at xing 115spl between bhatni and bhatpar rani in district deoria
Read moreProviding median closings between munneru hlb to rob from km 4/0 to 4/3 (blockspot id no tg-05-181), and ayyapa swamy temple from km 8/2-4 (blockspot id tg-02-117) on khammam -aswaraopeta section of nh-365bb in the state of telangana
Providing median closings between munneru hlb to rob from km 4/0 to 4/3 (blockspot id no tg-05-181), and ayyapa swamy temple from km 8/2-4 (blockspot id tg-02-117) on khammam -aswaraopeta section of nh-365bb in the state of telangana