Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Complete Repairing Overhauling Of 500 Gpm Pump 5 Stage Rkb/ Mla Of Kugp Make Kbl Head 150 Meter Sl No. 29 V2 Ab670/0040 And B) 500 Gpm Pump 5 Stage Rkb/ Mla Of Kugp Make Kbl Head 150 Meter Local Sl No.Kugp/Rkb003 At Kugp
|
Description |
Complete Repairing Overhauling Of 500 Gpm Pump 5 Stage Rkb/ Mla Of Kugp Make Kbl Head 150 Meter Sl No. 29 V2 Ab670/0040 And B) 500 Gpm Pump 5 Stage Rkb/ Mla Of Kugp Make Kbl Head 150 Meter Local Sl No.Kugp/Rkb003 At Kugp
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_336514_1 |
Reference Number |
PO/KUGP/EnM/Tender/25-26/05 |
Tender Fee | 0 |
EMD | 8900 |
Tender Value | |
Place | KUGP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348828 |
Start Date | May 30, 2025 16:30 |
End Date |
12/06/2025 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
15 nit of 2025-26 sl. no. 5, dtd-18.06.25
Sinking of deep tubewell (15 nos.) with p.v.c. pipes and suitable submersible pump and installation of storage tank with elevated platform etc. complete at different places within sankrail p. samity.
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreComprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Comprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Read moreComplete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Complete repairing of 01 no. 2000 gpm pump make wilo mnp type 10/12 pluro x 2chrs pump 490/490 mm head 150 mtr,sl.no. 81316960/20/10 under rajhara ocp, rajhara area
Read moreFor complete repairing of all injector and new nozzle tube of diesel bowser make tata modle ultra 1918t sl. no. - jh10cf 1726 at akwmocp katas area bccl.
For complete repairing of all injector and new nozzle tube of diesel bowser make tata modle ultra 1918t sl. no. - jh10cf 1726 at akwmocp katas area bccl.
Read moreComplete repairing and rewinding of (a) 01 no. 630kva, 3.3kv/440v k-sambhav make, with sl. no. ktc/tr/630/12 and (b) 01 no. 500kva, 11kv/440v gec make with sl. no. 22426418 oil cooled transformer for colony power supply under kathara colliery.
Complete repairing and rewinding of (a) 01 no. 630kva, 3.3kv/440v k-sambhav make, with sl. no. ktc/tr/630/12 and (b) 01 no. 500kva, 11kv/440v gec make with sl. no. 22426418 oil cooled transformer for colony power supply under kathara colliery.
Read moreSupply of 2 nos clear water submersible pump having head 55 mtr. and discharge 1500lpm, 1 no. clear water head 55 mtr. and discharge 1000lpm at phillaur complete in all respect
Supply of 2 nos clear water submersible pump having head 55 mtr. and discharge 1500lpm, 1 no. clear water head 55 mtr. and discharge 1000lpm at phillaur complete in all respect
Read moreComplete repairing and rewinding of 630kva 3.3kv-440v electroteknica make sl no. tf 110 distribution transformer of tnocp under hazaribagh area
Complete repairing and rewinding of 630kva,3.3kv-440v,electroteknica make, sl no. tf 110 distribution transformer of tnocp under hazaribagh area.
Read moreRepairing rectification and full overhauling with spares of 1000 gpm 100 mh model 8-8 dme, mnp make pump assembly at tapin north open cast project hazaribagh area.
Repairing rectification and full overhauling with spares of 1000 gpm, 100 mh, model 8-8 dme,mnp make pump assembly at tapin north open cast project hazaribagh area.
Read moreof your Industry type