Tender Details

Particulars Details
Title
Ce Mtpsi Se Es Mrt Ot53 25 26
Description
Mtps I Es Circle Mrt Unit Iv Boiler Area Electrically Operated Valve Actuators And Soot Blowers Carrying Out The Maintenance Works During Annual Overhaul For The Year 2025 2026
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_585851_1
Reference
Number
CE-MTPSI-SE-ES-MRT-OT53-25-26
Tender Fee 0
EMD 2300
Tender Value -
Place MTPS-I/METTURDAM
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=699836

Start Date July 26, 2025 17:30
End Date
Expired 11/08/2025

Expired 431 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps mech ii bm unit iii inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2026 2027

Ttps mech ii bm unit iii inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2026 2027

Read more
Ttps mech ii bm unit v inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit v inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2026 2027

Read more
Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback

Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback

Read more
Ttps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb

Ttps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb

Read more
Ttps es circle mrt i annual overhauling works in boiler side valves dampers, soot blowers l r blowers soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2025 26

Ttps es circle mrt i annual overhauling works in boiler side valves dampers, soot blowers l r blowers soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2025 26

Read more
Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub divisioniii

Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub divisioniii

Read more
Ttps es mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub- division iii

Ttps es mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v

Read more
Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v sub division iii

Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v sub division iii

Read more
Ttps es circle mrt i annual overhauling works in boiler side valves, dampers, soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit ii for the year 2024 25

Ttps es circle mrt i annual overhauling works in boiler side valves, dampers, soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit ii for the year 2024 25

Read more
Ttps es circle mrt i annual overhauling works in boiler side valves dampers soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2024 25

Ttps es circle mrt i annual overhauling works in boiler side valves dampers soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2024 25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise