Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Electrical Infrastructure Repair Services 🔧 The University Of Delhi, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Repair And Servicing Of High Tension (Ht) Cables And Panels At A Substation Adjacent To The Sbi Bank At The University Stadium. 📅 Bid Submission Deadline: June 18, 2024, 1:00 Pm Tender Fee: Inr 500 Emd: Inr 7614 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Electrical Infrastructure Repair Services. Proposals Should Include Detailed Methodologies, Timelines, And Compliance With Safety And Quality Standards. Keywords: Electrical Repair, Ht Cables, Ht Panels, Vc Bs, Substation, Delhi University, Central Govt. Ministry/Department, Bid Invitation, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Repairing Of 3 Core 185 Sqmm Ht Cable And Repairing/ Servicing Of Ht Panel/ Vc Bs In Substation Near Sbi Bank At Stadium, University Of Delhi
|
| Description |
Repairing Of 3 Core 185 Sqmm Ht Cable And Repairing/ Servicing Of Ht Panel/ Vc Bs In Substation Near Sbi Bank At Stadium, University Of Delhi
|
| Organisation | Delhi University | Central Govt. Ministry/Department |
| Tender Id | 2024_DU_809469_1 |
|
Reference Number |
CEET-5663 |
| Tender Fee | 500 |
| EMD | 7614 |
| Tender Value | - |
| Place | North Campus |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=850698 |
| Start Date | May 31, 2024 23:30 |
| End Date |
Expired
18/06/2024
Expired 848 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs and maintenance of ht lt underground cables earthings avr substation ht primary protection relays ht vcbs rmus transformers capacitor bank voltage stabilizers of various capacities and preventive allied works at gtre bangalore
Repairs and maintenance of ht lt underground cables earthings avr substation ht primary protection relays ht vcbs rmus transformers capacitor bank voltage stabilizers of various capacities and preventive allied works at gtre bangalore
Read moreRepair maint and replacement of ht power system over head lines ug cables and other connected accessories along with transformers vcbs panel and ht switchgear servicing at centreal area durkirk line beg and centre and tb ii at age e and m i under ge
Repair maint and replacement of ht power system over head lines ug cables and other connected accessories along with transformers vcbs panel and ht switchgear servicing at centreal area durkirk line beg and centre and tb ii at age e and m i under ge
Read moreMaintenance of electrical installation in residential building/ non residential building at chandigarh. (repair and servicing of ht ocb/ vcb and lt equipments installed in 11 kv indoor substation at model jail, sector-51, chd.
As per nit
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreRepairing of 3 core 185 sqmm ht cable and repairing/ servicing of ht panel/ vcbs in substation near sbi bank at stadium, university of delhi
Repairing of 3 core 185 sqmm ht cable and repairing/ servicing of ht panel/ vcbs in substation near sbi bank at stadium, university of delhi
Read moreStjk for 3 core 185 sqmm xlpe ht cable,stjk for 3 core 95 sqmm xlpe ht cable,stjk for 3.5 core 185
Read more
of your Industry type